My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - PROJ - HENINGER ELEMENTARY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
12/06/2016
>
23B - PROJ - HENINGER ELEMENTARY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 4:05:08 PM
Creation date
12/1/2016 3:52:12 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
12/6/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Status: Completed <br />Approximate Start/End Dates: Nov 2013 -Jan 2014 <br />Description of Supplies, Equipment, or Services Provided; Modify Traffic Signal at <br />One Intersection along with Traffic Control, LED Illuminated Street Name <br />Signs, Install New Cabinet, Safety Lighting, Loops, Vehicle Pre-emption <br />System, Sidewalk Access Ramps & Traffic Signal Heads. <br />Woodruff/Washburn Traffic Signal <br />Amount: $156,697.58 <br />Owner; City of Downey <br />Owner Address; 11111 Brookshire Ave Downey, CA 90241 <br />Project Manager: Keith Hoey <br />Contact Phone #: (552) 622.5898 <br />Fax #; (562) 904-7296 <br />Status: Completed <br />Approximate Start/End Dates: Apr2013-Aug 2013 <br />Description of Supplies, Equipment, or Services Provided: Upgrading Traffic Signal <br />at Intersection, Trenching, Conduit Runs, and Installation of LED Safety <br />Lighting, <br />Traffic Signal Modification at Brookhurst <br />Amount: $237,213.67 <br />Owner; City of Huntington Beach <br />Owner Address: 2000 Main Street Huntington Beach, CA 92648 <br />Project Manager: John Griffin <br />Contact Phone #: (714)375-5011 <br />Fax #: (714) 374-1648 <br />Status: Completed <br />Approximate Start/End Dates: March 2011-Sept2011 <br />Description of Supplies, Equipment, or Services Provided: Modify Traffic Signal at <br />Multiple Intersections along with Traffic Control, Installation of Curb Ramps & <br />Traffic Signal Heads, and Monument Preservations, <br />Traffic Signal System Upgrade Phase V -VIII <br />Amount: $292,175.99 <br />Owner: City of Santa Ana <br />Owner Address; 20 Civic Center Plaza Santa Ana, CA 92701 <br />Project Manager: William Albright <br />Contact Phone #: (714) 647-5029 <br />Fax #: (714) 647-5622 <br />Status: Completed <br />Approximate Start/End Dates: Jon 2011 -Aug 2011 <br />Description of Supplies, Equipment, or Services Provided: Installation of Conduit, <br />Pullboxes, Traffic Signal, Interconnect Cable, Communication Equipment, <br />Page 3 of 4 <br />Document Last Updated 41512016 <br />23B-37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.