My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23C - PROJ - WASHINGTON ELEMENTARY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
12/06/2016
>
23C - PROJ - WASHINGTON ELEMENTARY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 4:06:04 PM
Creation date
12/1/2016 3:52:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23C
Date
12/6/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL. <br />PROJECT NO,: 16-6$72 <br />SAFE ROUTES TO SCHOOL ENHANCEMENTS FOR WASHNGTON ELEMENTARY <br />STATE PROJECT NO: ATPL- 5063(161) <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: w1ron $ho0!ldsnoC%'11% Inc, <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the ContractDocuments in its entirety and 'hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Traffic Signal Installation at Flower St & <br />AnahurstPI <br />1 <br />LS <br />yLli0�)O' <br />2 <br />Traffic Signal Modification Warner Ave & <br />1 <br />LS <br />$ <br />$ <br />Flower St <br />\N1,6V <br />3 <br />OTT Opticom Cmergency Vehicle <br />1 <br />LS <br />$p <br />$ <br />Preemption Syslem at Flower St & <br />L 6P <br />Anahurst Pl <br />4 <br />OTT Optioom Emergency Vehicle <br />'I <br />LS <br />$ <br />$ <br />Preemption System at Waiver Av & <br />V 0 <br />e Loo <br />Flower St <br />t^�a <br />5 <br />Install 2" PVC Conduit Per Plan * <br />405 <br />LF <br />$12� <br />$ <br />6 <br />Install 3" PVC Conduit Per Plan * <br />870 <br />LF$ <br />^3 <br />$ f ti <br />C <br />7Install <br />4" PVC Conduit Per Plan* <br />460 <br />LF <br />$ <br />$ V�i1 tI>J <br />8 <br />Install No. 6 Pull Box <br />12 <br />LA <br />$ p 5 <br />$ 1 <br />9 <br />Install 6E Pull Box <br />4 <br />EA <br />$ <br />10 <br />Install Traffic Signal Loop Detector (Type <br />37 <br />EA <br />$ <br />$ <br />E Loop) <br />10-0 <br />11 <br />Install Bicycle Loop Detector (Type D <br />Circular Loop) <br />18 <br />EA <br />$ .0 <br />$q <br />)1i <br />12 <br />24 Strand SMCO Cable <br />1,000 <br />LF <br />$ <br />31.0 <br />31`7,00 <br />13 <br />Fusion Splice I Strand SMFO <br />36 <br />EA <br />$ 33 <br />$ <3;1%0 <br />P-1 of P-17 <br />23C-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.