My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARNAZ ENGINEERING CONTRACTORS, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ARNAZ ENGINEERING CONTRACTORS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2017 12:48:47 PM
Creation date
12/13/2016 10:58:46 AM
Metadata
Fields
Template:
Contracts
Company Name
ARNAZ ENGINEERING CONTRACTORS, INC.
Contract #
11-6412
Agency
Public Works
Council Approval Date
9/20/2016
Destruction Year
2021
Notes
PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CST <br />PROPOSALEXHIBIT <br />ANA EXHIBIT 2 <br />PROJECT NO.: 11-6412 <br />WALNUT PUMP STATION BU'I'L'DING'UPGRADB <br />ADDENDUM TWO <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Arnaz Engineering Contractors, Tno. <br />REQUI EMEN'F: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />worts, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit plice(s) or lump sums) set fcnth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unfit Price <br />Amount <br />1 <br />Mobilization and Demobilization, <br />Job <br />LS <br />$ <br />including Bonds, Permits, Cleanup <br />130,000. <br />130,000. <br />(maximum allowed is 4% of total bid <br />price <br />2 <br />Survey Staking and Verification of Utility <br />1 <br />J S <br />$ <br />Locations, Field Dimensions, and Existing <br />10,000. <br />10,000. <br />Electrical Work <br />3 <br />1314P hupleuientation and Erosion <br />1 <br />LS <br />_ <br />$ <br />$ <br />ControWomplianoo with SWPPP <br />10,000. <br />10,000. <br />Requirements <br />� <br />4 <br />Disinkotion of Facilities Dewatered <br />1 <br />LS <br />$ <br />$ <br />During Construction <br />5,000. <br />5,000. <br />5 <br />Startup and Testing <br />1 <br />LS <br />$ <br />25,00o. <br />$ <br />25,000. <br />6 <br />Record. Drawings, Q&M Manuals Enid <br />1 <br />LS <br />$ <br />$ <br />Warranties <br />5,000. <br />5,000. <br />7 <br />Training <br />1 <br />LS <br />$ <br />$ <br />5,000• <br />5,000, <br />8 <br />Clearing and Grubbing,'tree and <br />1 <br />LS <br />$ <br />$ <br />landscape Removal, Site Demolition and <br />25,000. <br />25,000. <br />Soil Preparation <br />9 <br />Structural, Meobanical and Electrical <br />1 <br />LS <br />$100,000. <br />$ 100 000. <br />Demolition <br />10 <br />Grading and Structural Excavation <br />l <br />LS <br />$ <br />35,000. <br />35,000. <br />[t <br />Retaining Walls, Walls, Fencing, Antenna <br />1 <br />LS <br />$ <br />$ <br />Foundation, Paving and Flatwork <br />300,000. <br />300,000• <br />12 <br />Connect to Existing Piping <br />1 <br />LS <br />$ <br />35,000. <br />$ <br />35,000. <br />'y;a,emo. <br />P-1 of P-17 <br />04. <br />
The URL can be used to link to this page
Your browser does not support the video tag.