My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARNAZ ENGINEERING CONTRACTORS, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ARNAZ ENGINEERING CONTRACTORS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2017 12:48:47 PM
Creation date
12/13/2016 10:58:46 AM
Metadata
Fields
Template:
Contracts
Company Name
ARNAZ ENGINEERING CONTRACTORS, INC.
Contract #
11-6412
Agency
Public Works
Council Approval Date
9/20/2016
Destruction Year
2021
Notes
PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 11 n6412 <br />WALNUT PUMP STATION BUILDING UPGRADE <br />ADDENDUM TWO <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />Al <br />Allowance for Reimbiusement for Formit <br />I <br />LS <br />$ 5,000 <br />$ 5,000. <br />Fees <br />A2 <br />Allowance for Raimb=urnent for SCE <br />I <br />LS <br />$ 10,000 <br />$ 10,000. <br />Power Service and Transfarmer Fees <br />A3 <br />Allowance for Cabinetry, Workbenches, <br />I <br />I's <br />$ 85,000 <br />$85,000, <br />Sholving, Shop Equipment, and Interior <br />Finish U_pgrades <br />A4 <br />Allowance for Field Orders <br />I <br />LS <br />$ 45,000 <br />$ A 5,000. <br />TOTAL BASE BID 1 $3,5 41 G.,000. oo <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall net be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />arnount for flus iters will be dictated by the actual quantity used, and the Agency reserves the <br />right to increaso or decrease the quantity of this item accordingly. <br />t This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications, <br />TIME FOR COMPLETION OF IMPROVEM'EN" TS A'N' 1 LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within 260 working days after the commencement date stated in the Notice to <br />Proceed.. The bidder also proposes to commence construction of the Work within 30 workine <br />days after issuance of a Notice to Proceed, and to continue in a diligent and workman -like <br />manner without interruption, and to complete the construction thereof within the time specified <br />above, <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the <br />Standard Specifications, shall be $1,500 per calendar day. <br />Name <br />Signal <br />Title <br />(If an. <br />all ind <br />and names of President, Secretary, Treasurer and Manager, thereof,) <br />P-3 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.