Laserfiche WebLink
CITY OF SANTA ANA EXHIBIT 2 <br />PROPOSAL <br />PROJECT NO.: 16-6854 <br />MAPLE BIDE TRAIL SAFETY ENHANCEMENTS PHASE II <br />ATPL-5063(164) — STATE FUNDED <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: EBS General Engineering, Inc, <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Unclassified Excavation* <br />700 <br />CY <br />$ <br />" <br />$ <br />i q0�_ <br />0� <br />2 <br />Concrete Removal* <br />20 <br />CY <br />^�"''� <br />$ <br />3 <br />AC Pavement* <br />100 <br />TN <br />$ <br />$ <br />4 <br />PCC Sidewalk (4")* <br />10,000 <br />SF <br />$ <br />sv <br />$ <br />`D,0do <br />5 <br />PCC Driveway Approach (Commercial = S")* <br />500 <br />SF <br />$ <br />$^,'��+� <br />((�f <br />�`.r✓ ' <br />M "`r.. <br />6 <br />PCC Curb Ramp* <br />7,200 <br />SF <br />$ <br />1 , G p J •— <br />$ '17, <br />s <br />7 <br />Furnish and Install Truncated Domes <br />38 <br />EA <br />$ <br />$ <br />8 <br />PCC Curb and Gutter (Type A-2.6)* <br />200 <br />LF <br />$ <br />Z- <br />$ <br />Ll . <br />9 <br />PCC Curb 6" x 12" (Type A-6)* <br />1,200 <br />LF <br />$ <br />$ <br />10 <br />PCC Curb and Gutter (Type B-1)* <br />1,200ISF <br />$ -} <br />$ <br />r <br />PS <br />r2.J <br />11 <br />PCC Cross -Gutter (Local Street)* <br />500 <br />$c <br />oo12 <br />Root Shave* <br />2 <br />$ <br />D00 <br />$ <br />/ D( ✓ <br />13 <br />Adjust Water Valve Frame and Cover* <br />2 <br />EA <br />$ <br />$ <br />570D -'" <br />001] '-- <br />P-1 ofP-t7 <br />