Laserfiche WebLink
:1y2armr:Mrrr <br />Technical Noise Analysis (TS4) <br />Establish citywide baseline noise levels for roadway, rail, and fixed noise sources. <br />Graphic Design and Web Support (TS5) <br />Provide graphic design support for General Plan material. Under the direction of staff, <br />assist in refining the General Plan layout, graphics, and visual interest for the General <br />Plan webpage to promote community engagement and understanding of the General <br />Plan Update. Support for General Plan Element document layout and graphics to be <br />provided. <br />General Plan Videos (TS6) <br />Create three (3) separate videos to summarize various general plan work efforts and <br />community engagement. Spanish and Vietnamese subtitle are to be provided for each <br />video production. <br />Technical studies and services one through seven (TSI—TS6) above are to be completed by <br />July 2017, in conjunction with upcoming General Plan Advisory Group meetings which will <br />assist towards the development of the draft General Plan Vision State and Policy <br />Framework. <br />Traffic Analysis (TS7) <br />Conduct a citywide traffic study, analysis and modeling. The overall analysis is to include <br />both Level of Service (LOS) and Vehicle Miles Traveled (VMT) as required to comply with <br />current legislative requirements. <br />Air Quality & Greenhouse Gas Analysis (TS8) <br />Utilizing the traffic study, analyze air quality and greenhouse gas impacts associated with <br />the Land Use Envisioning map. <br />Noise Analysis (TS9) <br />Utilizing the traffic study, analyze noise impacts for roadway, rail, and fixed noise sources <br />associated with the Land Use Visioning map. <br />Urban Design (TS10) <br />Evaluate the existing conditions and context that defines neighborhood character and <br />features citywide and within the Land Use Visioning focus areas. <br />After the Land Use Visioning map alternatives have been identified August 2017, the <br />technical studies and services eight through fifteen (TS7-TS10) shall be completed by <br />between August 2017 and November 2018. <br />The Consultant shall provide technical and environmental services under the direction of City <br />staff. The Consultant will be expected to provide experienced and knowledgeable <br />professional staff. The Consultants' Project Manager and staff shall be responsive and <br />maintain excellent working relationships with City staff, project applicant, property owners, <br />and/or developer. The Consultant shall be committed to provide adequate staffing levels at <br />12/1/16 rev <br />19D-6 <br />MWCA ahibltst2010U2-20-1O VP Cenewl Plan - M ibit I.d.cx <br />