My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - PED IMPROVEMENTS SA BLVD
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
12/20/2016
>
23A - PROJ - PED IMPROVEMENTS SA BLVD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2016 10:33:08 AM
Creation date
12/15/2016 4:14:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
12/20/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO,: 17-6888 <br />PEDESTRIAN IMPROVEMENTS ON SANTA ANA BOULEVARD <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />14 <br />Furnish and Install New Survey Monument* <br />1 <br />EA <br />$ N r m) <br />$ i 1 Q 00 <br />15 <br />Adjust OCSD Manhole Frame and Cover to <br />Finished Grade* <br />1 <br />EA <br />$ tf Go <br />$ 1 (20 <br />t r <br />16 <br />Signing and Striping <br />1 <br />LS <br />$3o ) POo <br />$ ^� ®l I oo <br />J <br />17 <br />Temporary Construction Signs <br />2 <br />EA <br />$C? <br />$ p '" <br />I <br />t 8 <br />Install RRFB (Rectangular Rapid Flashing <br />Beacon) System <br />I <br />LS <br />A Irl �� <br />9 J <br />$ <br />�1• J <br />TOTAL BASE BID <br />$ I �J <br />Add Alternative Bid "I" <br />14 <br />Romeve Pole, Foundation, Solar Panel and <br />Cabinet <br />I <br />LS <br />V rox <br />$ J <br />Total Adel Alt 1 <br />$ <br />Add Alternative Bid "II" <br />20 <br />Unclassified Excavation* <br />20 <br />CY <br />$ 500 <br />$ 1 oClp'g <br />21. <br />Install PCC Sidewalk (4") <br />800 <br />SF <br />'I'm <br />$ 6,1600 <br />�Q% tJ <br />22 <br />Install PCC Curb Ramp <br />300 <br />SF <br />$ <br />, � <br />$ .3N'00— <br />3 ' 00 <br />23 <br />Install PCC Curb and Gutter (Type A-2.8) <br />100 <br />LF <br />$ <br />$ '57 b® <br />24 <br />Root Shave* <br />1 <br />EA <br />$ TOO <br />25 <br />Abandon Gate Valve* <br />1 <br />EA <br />$ k' U ®® <br />$ � 1000 <br />26 <br />Remove Fire Hydrant and Assembly <br />1 <br />EA <br />1"7roo® <br />{$ <br />1-7,®®c) <br />27 <br />Famish and Pistall New Fire Hydrant <br />1 <br />BA <br />$' <br />r � <br />t <br />28 <br />Adjust Water Meter Frame Box to Finished <br />Grade* <br />I <br />EA <br />$ <br />(Poo <br />$ <br />00 <br />Total Add Alt 2 <br />An <br />P-2 of P-18 <br />23A-8 <br />Kr <br />a; <br />
The URL can be used to link to this page
Your browser does not support the video tag.