Laserfiche WebLink
Trip Distribution and Roadway Assignment <br />Ultimate Build -out Scenario, Using the Latest OCTA Traffic Model (OCTAM) to Produce a Long Range <br />Condition Baseline <br />• Traffic Impact Analysis <br />* Existing Conditions (2016) <br />Existing plus Project Conditions (2016) <br />Opening year without Project Conditions <br />Opening year with Project Conditions <br />Future Project Design Year without Project Conditions <br />* Future Project Design Year with Project Conditions <br />Site Access and Circulation <br />• Evaluation of Need of Additional On-site and/Off-site Traffic Controls <br />Mitigation Measures for Intersections/Roadways with Levekof-Service Worse than a Value of °D" <br />Compliance with CEQA Guidelines <br />• Conclusions <br />TASK S -- SUBMITTAL AND REVIEW OF REPORT <br />The traffic study will be submitted to the City for review. Any proper or reasonable revisions will be <br />incorporated into the traffic study in order to be fully responsive to the scope of services. Reasonable <br />revisions include any corrections to the report within the general scope of work, but exclude any traffic <br />data collection or analysis at any locations, except as specified in our proposal. <br />TASK 6 —ATTENDANCE AT MEETINGS <br />In addition to the kick-off meeting under Task I, KOA will attend these meetings: <br />• Three progress meetings with City staff <br />• One Planning Commission General Plan & Zoning Subcommittee Meeting or Study Session <br />• One Planning Commission Hearing <br />• One City Council Hearing <br />11 <br />25E-15 <br />