My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25J - AGMT - ZOO RIVER OTTER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
12/20/2016
>
25J - AGMT - ZOO RIVER OTTER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2016 10:39:33 AM
Creation date
12/15/2016 4:54:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25J
Date
12/20/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASSUMPTIONS <br />1. CLR Travel Assumptions: <br />See proposed project schedule for assumed quantity of workshops and on-site <br />construction visits. <br />Of the 8 design workshops/meetings proposed during Tasks 1-4, we are assuming <br />(2) meetings will include 1 -person (PIC or Project Architect) traveling from our <br />Philadelphia office, accompanied by CLR staff from the CA office. <br />2. TJP Travel Assumptions: <br />Assuming a total of 7-8 onsite meetings. No overnight travel accommodations <br />anticipated. <br />3. Husbandry Expert Assumptions: <br />• Karl Kranz, Animal Husbandry consultant, will participate via conference calls and web - <br />based (audio/video) meetings. Upon request, on-site meetings can be included at an <br />additional cost. <br />4. LSS Design Assumptions: <br />As a proposed cost reduction measure, the existing 80,000 gallon pool will not require <br />underwater viewing quality water/filtration for the entire volume. The system will be <br />designed for a 30K -40K gallon pool area with underwater viewing, as well as additional <br />shallow swim zones utilizing as much of the existing moat system as feasible. <br />LSS will be located outdoors below a shade structure (no building required). Some <br />interior space for ozone equipment will be required. <br />5. Site, Habitat and Building Assumptions: <br />Exhibit Interior Holding and Kitchen Area, as described in RFP - the design team will <br />assess and retrofit as appropriate. We are not anticipating a major building expansion. <br />• Public Viewing Areas, as described in RFP - assuming a new observation deck (existing <br />wood structure is aging) as well as an underwater viewing zone. <br />6. GASP Accessibility Review Assumptions: <br />Four hours of a CASP consultant (Principle at CD/A) is included in this proposal to <br />review the project plans during detailed design. Any additional time required can be <br />provide as an additional service. <br />7. Surveys: <br />Site Topographic and Geotechnical Survey work is excluded from this proposal. It is <br />assumed that this work will be provided by the Owner if required. If desired, these <br />services can be added to our Agreement upon request, as an additional service. <br />8. Construction Budget: <br />Our understanding is that the Construction Budget is approximately $1.45M and the <br />total Project Budget is $2M. <br />25J-24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.