My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RESO 2016-41_4412 Westminster Ave (Two Thumbs Up Car Wash)
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2016
>
RESO 2016-41_4412 Westminster Ave (Two Thumbs Up Car Wash)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2016 12:43:25 PM
Creation date
12/21/2016 12:43:05 PM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Conditions of Approval <br />Conditional Use Permit No. 2016-36 is approved subject to compliance, to the <br />reasonable satisfaction of the Planning Manager, with all applicable sections of the <br />Santa Ana Municipal Code, the California Administrative Code, the California Building <br />Standards Code and all other applicable regulations. <br />The applicant must comply in full with each and every condition listed belowrip or to <br />exercising the rights conferred by this conditional use permit. <br />The applicant must remain in compliance with all conditions listed below throughout the <br />life of the conditional use permit. Failure to comply with each and every condition may <br />result in the revocation of the conditional use permit. <br />1. All proposed site improvements must conform to the Site Plan Review approval <br />of DP No. 2015-66. <br />2. Any amendment to this conditional use permit must be submitted to the <br />Planning Division and Police Department for review. At that time, staff will <br />determine if administrative relief is available or the conditional use permit <br />must be amended. <br />3. Prior to approval of Certificate of Occupancy, all on-site improvements shall be <br />made in accordance with the submitted plans. <br />4. Hours of operation shall be limited to 7:00 a.m. to 9:00 p.m. seven days a week. <br />5. Roll -up doors shall be provided to restrict access to the car wash tunnel during <br />non-operating hours. <br />6. Vacuuming equipment shall not be available or functional during non-operating <br />hours. <br />7. Prior to approval of Certificate of Occupancy, all on-site signage including <br />directional signage shall be submitted for review and approval and shall be <br />under separate permit. <br />8. On-site employees shall be responsible for the removal of all litter and trash <br />from the site each day. <br />9. Inoperable or malfunctioning equipment shall be repaired or replaced in a <br />timely manner. <br />Resolution No. 2016-41 <br />Page 8 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.