My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WEBER WATER RESOURCES, LLC-2016
Clerk
>
Contracts / Agreements
>
W
>
WEBER WATER RESOURCES, LLC-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2016 8:32:53 AM
Creation date
12/29/2016 8:31:16 AM
Metadata
Fields
Template:
Contracts
Company Name
WEBER WATER RESOURCES, LLC
Contract #
A-2016-312
Agency
PUBLIC WORKS
Council Approval Date
11/15/2016
Insurance Exp Date
5/1/2017
Destruction Year
0
Document Relationships
WEBER WATER RESOURCES, LLC
(Amended By)
Path:
\Contracts / Agreements\W
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO,; 26-090 <br />WATER WELL, PUMP ANIS MOTOR REPAIR SERVICES <br />d. Motor Inspection report, including stator core loss testing results. Photo documentation of coils, <br />windings and conductors showing any signs of excessive wear or failure, <br />a. Mechanical fitmeasurements shall be recorded as specified, Photo documentation shall be submitted <br />for all replaced bearings„ greaso Pittings, plugs, etc. <br />f. Rotor balancingreport as specified, <br />g. Insulation report as specified above. Before and after photo documentation of the windings prior to <br />varnishing and baking. <br />h. Final test report as speclfied: <br />I. Pump Reconditioning report as specified, <br />All testing, inspections and incidentals related to required reports shall be considered included within the <br />bid items for said testing report and no additional compensation shall be allowed. <br />C. Security Requirements <br />Public Works Agency field, representative will unlock the Public Works Agency facilities entry gates <br />on the first day of work to allow Contractor access. Contractor shall then supply their own <br />padlock(s) for entry gates to all PulclicWorks Agency facilities. Contractor's padlock(s) shall look <br />onto the Public Works. Agency's padlock connecting to the chain-link, which enables both the Public <br />Works Agency field representative and Contractor to unlock the entry gates. After completion of <br />work, pedlock(s) shall be removed by the Contractor, <br />Contractor andlor subcontractors shall notify the Public Works Agency field representative upon <br />arrival and departure to or from jobsite. <br />€7.. Parts, Materials and Warranties <br />The Public Works Agency will reimburse the Contractor for the best of repair parts, materials, and <br />replacement equipment; plus 15 percent markup, provided the Contractor has obtained the City's prior <br />written approval of Qontractoes written estimate. All replacement equipment shalt, be approved by the <br />Public Works Agency prior to the purchasing of the equipment. The Contractor shall provide <br />manufacturer documentation to the Public Works Agency for any replacement equipment. The <br />Contractor shall submit an Invoicewith attached applicable receipts for a partieutar job to the Project <br />Manager. <br />The Contractor shall assure that all materials, parts, and workmanship supplied shall.ba free from original <br />or developed defects. Contractor shall provide a minimum of one year warranty for materials, pans and <br />workmanship, Should original ordeveloped defects andlor failures appearwithin the minimum warranty <br />of one year after work completion, Contractor shall, at its expense, rectify soon defects andlor failures and <br />make, all replacements and adjustments that are required. <br />Corrective work shall be performed by the Contractor and given the highest priority after Public <br />Works Agency's notification to do so, and shall be completed to the satisfaction of the Project Manager, <br />The Contractor shall proceed diligently to complete said work within the time allotted as approved by the <br />Project Manager. <br />E. As -Needed Repairs <br />At the direction of Project Manager, the Contractor shall provide a written estimate including labor and <br />parts, materials and equipment needed to perform the As-Noeded. Repairs. Upon written approval from <br />the Project Manager, the Contractor shall perform the As -Needed Repairs, The cost for parts and <br />materials will be paid in accordance with the Section C above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.