My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WEBER WATER RESOURCES, LLC-2016
Clerk
>
Contracts / Agreements
>
W
>
WEBER WATER RESOURCES, LLC-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2016 8:32:53 AM
Creation date
12/29/2016 8:31:16 AM
Metadata
Fields
Template:
Contracts
Company Name
WEBER WATER RESOURCES, LLC
Contract #
A-2016-312
Agency
PUBLIC WORKS
Council Approval Date
11/15/2016
Insurance Exp Date
5/1/2017
Destruction Year
0
Document Relationships
WEBER WATER RESOURCES, LLC
(Amended By)
Path:
\Contracts / Agreements\W
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />RFP NO.: 16-090 <br />WATER WELL, PUMP AND MO'FOR REPAIR SERVICES <br />terminals or lugs p <br />SET 1 <br />243.00 <br />243.00 <br />oil <br />Telluswin <br />_ <br />LS 1__ <br />202.50 <br />202.60_ <br />in <br />Rewinding of Electric Motor <br />LS 1 <br />4,898.OD <br />4,898.00 <br />— <br />Mobilization & set-up <br />1 250:00 <br />1,250.00 <br />Under Water video of well (before) _ <br />1,100.001,19244_ <br />Wire brushing of well section under water & <br />arforations <br />9,100.00 <br />9100.00 <br />Chemical treatment during wire brushing (optional) 2 <br />Ta.1 <br />26 350.00 <br />26 350.00 <br />Bail & dispose of all dirt & debris <br />2L350.00___R <br />Jet of perforations L4?0feet, three Intervals) 3 <br />6 0. 0 <br />6.340.00Under <br />Water video of well (after) <br />_ <br />QQQ 00 <br />Demobillzation & piok-up <br />LS <br />1 <br />1,250.tl0 <br />1,25000 <br />R <br />* NOTE . ALL PRICING INCLUDES APPLICABLE SALES TAX, <br />Proposed new pump: Make: Natlonal PumpModel No.: H14MC 'GPM: 3,000 TDH: 165 <br />Eff.: 84'6 % + NOTE: THIS DESIGN POINT WILL OPERATE IN SLIGHT OVERLOAD WITH 1 50H MOTOR. <br />1. Motor refurbishing includes shop work, labor and material to perform the following: disassembling, <br />steam cleaning, inspection, replace bearings, heaters, dipping (one thin layer, baking, reassembling, <br />testing) <br />2. Chemical treatment during wire brushing will not be used in the evaluation of the bids. If chemical <br />treatment Is applied, the bid price must include cost of the chemicals, chemicals handling (application & <br />mixing), used chemicals neutralization and disposal. <br />3. Sonar Jet must be performed by SONAR -Jet by Water Well redevelopers, Inc. (714) 632-7003 <br />4. Chemical treatment during wire brushing will not be used in the evaluation of the bids. If chemical <br />treatment is applied, the bid price must include cost of the chemicals, chemicals handling (application & <br />mixing), used chemicals neutralization and disposal. <br />5. Pump base will be replaced, and attached to existing discharge pipe. If welding is needed, will be bill at <br />time and material. <br />6. Concrete around the pump base will have to be removed and replaced. <br />7. New Stainless Steel line for sounding will be provided and installed, with necessary mounting brackets, <br />and one gauge calibrated for sounding. <br />8. Sound attenuation shall be required for major work. Sound attenuation for engine noise shall be limited <br />to a maximum of 75 dB(A) at 23 feet when operating at full rated load. Sound proofing solution to be <br />approved by the Engineer. ^� a <br />7—b <br />���1 bV fitipi� Ci 0, <br />
The URL can be used to link to this page
Your browser does not support the video tag.