Laserfiche WebLink
CITY or'S xA ANA <br />RFP NO.: 1&090 <br />WATER WELL, PUMP AND MOTOR. REPAIR SERVICES <br />Apoendix <br />ATTACHMENT 1: SCOPE OF WORK <br />A. General Description <br />The Contractor shall provide water well easing, pump and motor rehabilitation; repair, replacement and related <br />services for the City of Santa Ana at various locations within the City. The general scope of services is <br />described, below.. <br />8.. Work Description <br />The Contractor shall provide all necessary supervision„ labor, materials, tools, and equipment to <br />perform pump pulling and Installations, water well rehabilitations,, well casing repairs and installations, <br />water well video inspections,, electric motor repairs, electric motor raw. indings, and repairseruces <br />on various types of pumps and, motors, on an as assigned 'basis at various locations throughout the <br />City., The Contractor shall meet with the Water Production project manager prior to starting any work <br />at the works€to. Access to the worksite shall be controlled by the Public Works Agency according to <br />the security standards in place at that time, The Contractor's services shall include, but are not <br />necessarily limited to, the following: <br />The Contractor shall provide transportation for its heavy duty equipment, such as, but not limited to, <br />drilling rig, pump rig, flatbed truck, boom truck, tractor trailer, as requested by the City to and from. <br />Contractor's facility to each Water Production worksite. All electric motor repair work shall be <br />transported by the Contractor to an EASA Accredited Member facility for repair and returned to the City, <br />when repairs are complete All. water discharged shall be through an NPDES 'Facility approved by the <br />Project Manager. It shall be. the Contractor's responsibility to propose a m. ethod to discharge water that is <br />NFIDES compliant andtnay include methods such as water detention through storage tanks: or other <br />conforming strategies. <br />1. PUMP REMOVAL( NSTALLATiON SERVICE <br />The Contractor shall be qualified to perform water well pumps removal enol Installation. At the initial, setup <br />for pullfnrd a well pump, the Contractor shall perform loekoutitagout of the electrical and hydraulic systems. <br />2. WELL PERFORMANCE TESTING SERVICE <br />The Contractor shall be qualified to perform well performance testing. After initial well performance testing <br />setup, all testing data shall be given to the. City representative upon completion of testing. The <br />Contractor shall furnish and install t h e development engine temporarily used to power the test pump <br />process to flush out all sand and small grit out of the area around the well to prevent clogging of the. <br />distribution system: All water discharged shall be through an approved facility approved by the Project <br />Manager. The Contractor shall provide the Project Manager with its evaluation and recommendation, <br />including cost estimates per project. All testing work shall be subject to the Project Manager's written <br />approval prior to commencing any work by the Contractor. Well performance testing shall be done in <br />accordance with AWWA Al 00-97 standards. <br />3. WATERWORKS PUMP REPAIR SERVICE <br />The Contractor shall be qualified to repair of one or more of the following pump units: <br />