My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BAKERSFIELD WELL & PUMP CO.-2016
Clerk
>
Contracts / Agreements
>
B
>
BAKERSFIELD WELL & PUMP CO.-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2019 4:39:56 PM
Creation date
12/29/2016 8:46:35 AM
Metadata
Fields
Template:
Contracts
Company Name
BAKERSFIELD WELL & PUMP CO.
Contract #
A-2016-311
Agency
PUBLIC WORKS
Council Approval Date
11/15/2016
Insurance Exp Date
3/1/2020
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GITY OF SANTA AN <br />REP NO.: 15-090 <br />WATER WP-F L, PUMP AND MOTOR REPAIR SERVICES <br />d. Motor Inspection report, including stator core loss testing results. Photo documentation of oails, <br />windings and conductors showing any signs of excessive wear or failure. <br />e. Mechanical fit measurements shall be recorded as specified, Photo documentation shall be submitted <br />for all replaced bearings, grease fittings, plugs, etc. <br />f, Rotor balancing report aS specified. <br />g, Insula:tiPn report, as speolfed ebove,. Before and after photo documentation of the win <br />dJn.g.s prior to <br />varnishing and baking. <br />h. Final test report as specified, <br />1. Pump Reoonditfonfng report as specified. <br />All testing, inspections and incidentals related to required reports shall be considered included within the <br />bid items for said testing report and no additlonal compensation shall be allowed. <br />C. Security Requirements <br />Public Works Agency field representative will unlock the Public Works Agency facilities entry gates. <br />on the first day of work to allow Contractor access. Contractor shall then supply their own <br />padlock(s) for entry gates to all Public Works Agency facilities. Contractor's padlock(s) shall lock <br />onto the Public Works Agency's padlock connecting to the chain -link, which enables both the Public. <br />Works Agency field representative and Contractor to unlock the entry gates. After completion of <br />work, pad[ock(s) shall be removed by the Contractor. <br />Contractor and./or subcontractors shall notify the Public Works Agency field representative upon <br />arrival and departure to or from jobs'ite. <br />D. Parts, Materials and Warranties <br />The Public Works ,Agency will reimburse the Contractor for the cost of repair ,parts, materials, and <br />replacement equipment,, plus 25 percent markup, provided the Contractor has obtained the C ty's prior <br />written approval of Contractor's written estimate. All replacemen,t.equip ment shal[.ica approved by <br />Public Works Agency prior to the purchasing of the equipment. The Contractor shall provide <br />manufacturer documentation to the Public Works Agency for any replacement equipment. The <br />Contractor shall submit an Invoice with attached applicable receipts for a particularjob to the Project <br />Mtanager,. <br />The Contractor shall assure that all materials, parts, and workmanship supplied shall be Free from original <br />or developed defects, Contractor shall provide a minimum of one year warranty for materials, parts and <br />workmanship. Should original or developed defects and/or failures appear within the minimum warranty <br />of one year after work completion, Contractor shall, at its expense, rectify such defects and/or failures and <br />make all replacements and adjustments that are required. <br />Corrective work shall be performed by the Contractor and given the highest priority after Public <br />Works Agency's notification to do so, and shall be completed to the satisfaction of the Project Manager. <br />The Contractor shall proceed diligently to complete said work within the time allotted as approved by the <br />Project Manager, <br />E. As -Needed Repairs <br />At the direction of Project Manager, the Contractor shall provide a written estimate including labor and <br />parts, materials and equipment needed to perform the As -Needed Repairs. Upon written approval from <br />the Project Manager, the Contractor shall perform the As -Needed Repairs. The cost for parts and <br />materials will be paid in accordance with the Sectlon D above. <br />
The URL can be used to link to this page
Your browser does not support the video tag.