Laserfiche WebLink
rd <br />CITY O hLNY4 ttit <br />i _ATtift M ELL,. Ii -lND NIQToR !U.PAIR SW_(tL'iC'tiS <br />- <br />... <br />TerlLIS 68 Oil _ L5 <br />Rewi ding of Electric Motor f` LS <br />Mobilization &set-up 1_, 00 <br />UnderU'iater video of well (bfo ere} 9 p00.00 <br />Mire brushing of well sectttiry under 'water tax Ea. 1 4,200.00 4,200,00 <br />wpe orations <br />C i,emcai treatment dunno wire brushing tronali 2 LS 95 OD6 DO <br />goip w. _..._.. ...,._�...,,._...��..W.�... _ ,�. _,. <br />Bail & dispose of all dirt & debris Set I500.D0 <br />SQNA Jet of perforations (20 feet, three intervals) 3. .L.-,_.... <br />S 1 <br />U der Nlater video of well (after) LS 1 858,00 <br />Dernotriliaation &pick-up t»S t 450.00 <br />\iote Antr Jtt er w ork 3ro+ r sled above ,oil be. Gx)mpreted or, trme and . ,Itsrafs bids. <br />Proposed new pump. Make: Peerless Model No 16HXB GPM: 3,Q00 TDH: 165' <br />Eff.: 83.5 <br />1 Motor refurbishing includes shop work, labor .and material to perform the following:, disassembling,. <br />steam cleaning. inspection, replace bearings, heaters, dipping (one thin layer, baking, reassembling. <br />testing) <br />2 Chemical treatment during wire brushing will not be used in the owaluat,on of the bids. If cheancar <br />treatment is applied, thebid price must include cost of the cherr?icats. chemicals handling (appiicatiorr, <br />mixing), used chemicals neutralization and disposal. <br />3; Sonar Jet must be performed by SONAR -Jet by vrlaterVVeil redevelopers, Inc. (714) 632-70 3 <br />.1, -. hemical treatment during wire brushing will not beused in the evaluation of the bids, if chemical <br />treatment isapplied rthe bid price must include cost of the chemicals chernicals handling (application & <br />mixing), used chemicals neutralization and disposal. <br />7-. Pur is base will be replaced, and attached to existing discharge pipe If weiding is needed, will be bill at <br />time and material. <br />6. Concrete around tfre pump base will have to be removed and replaced, <br />7, Now Stainless Steel line for sounding will be provided and installed, with necessary mounting brackets, <br />and one gauge calibrated for sounding: <br />8`, Sound attenuation shall be required for major work, Sound attenuation for engine noise shall be limited <br />to a maximum of 75 dB(A) at23 feet when operating at Pull rated load. Sound proofing solution to be <br />approved by the Engineer, <br />