My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SOUTHERN CALIFORNIA EDISON (SCE) (3)
Clerk
>
Contracts / Agreements
>
S
>
SOUTHERN CALIFORNIA EDISON (SCE) (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 7:52:38 AM
Creation date
1/5/2017 7:51:55 AM
Metadata
Fields
Template:
Contracts
Company Name
SOUTHERN CALIFORNIA EDISON (SCE)
Contract #
N-2016-193
Agency
Public Works
Expiration Date
12/31/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rights of Way <br />Applicant hereby grants to SCE the rights of way and easements for the Distribution Line <br />Extension over the shortest, most practical, available, and acceptable route within <br />Applicant's property for the purpose of making delivery of electric service hereunder. Such <br />easement shall include the right of access and right to trim trees as necessary. Where <br />formal rights of way, easements, land leases, or permits are required by SCE for <br />installation of facilities on or over Applicant's property, or the property of others, Applicant <br />understands and agrees that SCE shall not be obligated to install the Distribution Line <br />Extension for the Project unless and until any necessary permanent rights of way, <br />easements, land leases, and permits, satisfactory to SCE, are granted to or obtained for <br />SCE without cost to or condemnation by SCE. <br />Advances <br />Applicant shall contribute or advance, before the start of construction, the refundable and <br />non-refundable amounts as set forth in Appendix A to this Contract. This includes the <br />costs for substructures and conduits which SCE had previously installed at its expense in <br />anticipation of the current Distribution Line Extension. Any necessary riser conduit, <br />conduit covering, and miscellaneous riser material required for the Distribution Line <br />Extension shall be furnished or paid for by Applicant and shall be installed by SCE. <br />All contributions and advances by Applicant are taxable and shall include an Income Tax <br />Component of Contribution (ITCC) at the rate provided in SCE's Preliminary Statement. <br />ITCC will be either refundable or non-refundable depending on whether the corresponding <br />contribution or advance is refundable or non-refundable. <br />Joint Applicants. The total contribution or advance from joint Applicants will be <br />apportioned by SCE among the members of the group in such manner as Applicants <br />mutually agree. <br />3.2 Responsibilities of SCE <br />Construction <br />SCE shall install, own, operate, and maintain the Distribution Line Extension to serve the <br />Project. SCE will install only those facilities that, in SCE's judgment, will be used within a <br />reasonable time to serve permanent loads. <br />Refunds <br />SCE shall make refunds to Applicant in accordance with the provisions of Rule 15. <br />3.3 Ownership of Facilities <br />Title to and ownership of the Distribution Line Extension shall vest in SCE. Applicant does <br />hereby agree that upon completion and acceptance by SCE of any Applicant -installed <br />facilities, title to each and every component part thereof shall immediately pass to SCE <br />free and clear of all liens and encumbrances. <br />Form No. 16-330 <br />Rev. 12/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.