My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NPG, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
NPG, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2017 10:10:24 AM
Creation date
1/12/2017 12:15:15 PM
Metadata
Fields
Template:
Contracts
Company Name
NPG, INC.
Contract #
16-2667
Agency
Public Works
Council Approval Date
11/15/2016
Destruction Year
2021
Notes
PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Vicente Sarmiento <br />COUNCILMEMSERS <br />Angelica Amezcua <br />P. David Benavidea <br />Michele Martinez <br />Roman Reyna <br />Sal Tlnalaro <br />CITY OF SAMA ANA <br />20 Civic Center Plaza e P.O. Box 1988 M-36 <br />Santa Ana, California 92702 <br />(714)64"7.5013 <br />AW—W SA <br />CITY MANAGER <br />David Cavazos <br />CITY ATTORNEY <br />Sonia R. Carvalho <br />CLERK OF THE COUNCIL <br />Marla D. Huizar <br />DEFINITION OF BID ITEMS <br />Page 2 of 3, Bid Item No. 4 -- Emulsion -Aggregate Slurry (Type II -CSS -1h -EAS) <br />Payment for Emulsion -Aggregate Slurry (Type 11 -CSS -1 h -EAS), shall be at the contract unit <br />price bid per ton listed in the Bid Proposal, and shall include full compensation for doing all <br />work, including furnishing all materials, labor, equipment, tools, and incidentals as required <br />and no additional compensation will be allowed therefore. <br />REPLACE WITH: <br />Payment for Emulsion -Aggregate Slurry (Type II -CSS -1 h -EAS), shalt be at the contract unit <br />price bid per extra long ton listed in the Bid Proposal, and shall include full compensation for <br />doing all work, including furnishing all materials, labor, equipment, tools, and incidentals as <br />required and no additional compensation will be allowed therefore, <br />4. DEFINITION OF BID ITEMS <br />Page 2 of 3, Bid item No. 7 — Crack Sealing <br />Payment for Crack Sealing shall be at the contract lump sum bid listed in the Bid Proposal, <br />and shall include full compensation for furnishing all materials, labor, equipment, tools, and <br />Incidentals as required and no additional compensation will be allowed therefore. <br />REPLACE WITH: <br />Payment for Crack Sealing shall be at the contract lump sum unit price bid linear feet listed <br />in the Bid Proposal, and shall include full compensation for furnishing all materials, labor, <br />equipment, tools, and incidentals as required and no additional compensation will be <br />allowed therefore. <br />Page 2 of 3, Bid Item No. 8 — Signing & Striping (Oil Based Paint) <br />Payment for Signing & Striping with oil base paint shall be at the contract lump sum bid <br />listed in the Bid Proposal, and shall include full compensation for furnishing all materials, <br />labor, equipment, tools, disposal of all removed materials, and incidentals as required and <br />no additional compensation will be allowed therefore. <br />2 of <br />SANTA ANA CITY COUNCIL <br />Miguel A Polido viwnlea.m [. WholeM14dtlrr.+s Mgellea Amesua P. OoNd Uo,,.hrs Romen Reyna Sal nnapro <br />Mayor Maya,P Tem.Werd9 WSM2 Wale Ward4 ftmS I Ward6 <br />mpuli,sen vze,mlunrorasarvh5-aaae ',rtYax nnxaara ore aamezr,m tlCenavldez <br />___._ zzn a-3 I rrek: zanta..}!ia.o,R i stlg,der Wa,dte-ana.gy <br />
The URL can be used to link to this page
Your browser does not support the video tag.