My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMTS - FIELD MAINT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
01/17/2017
>
25E - AGMTS - FIELD MAINT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 4:04:36 PM
Creation date
1/12/2017 3:34:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25E
Date
1/17/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.6.1 One (1) 60' base path Girls Softball/ Little League diamond with skinned <br />brickdust infield. <br />1.7 Santiago Park - District 2 <br />1.71 One (1) 60' base path Girls Softball diamond with skinned brickdust infield. <br />2.0 Schedule of Work to be Completed <br />2.1 Cabrillo Park: 5 Days per wk, Feb 1 at to July 15th <br />1 Day per wk, July 16th to Jan 31 st <br />2.2 Delhi Park: <br />1 Day per wk year round <br />2.3 Madison Park: <br />5 Days per wk, Feb 1 st to July 1511' <br />3 Day per wk, July 16th to Jan 31 st <br />2.4 Memorial Park: <br />5 Days per wk, Feb 1st to July 15a' <br />1 Day per wk, July 16th to ,tan 31 st <br />2.5 Morrison. Park: <br />3 Days per wk, Feb 1st to July 15a` <br />1 Day per wk, July 16th to Jan 31st <br />2,6 Portola Park: <br />3 Days per wk, Feb 1st to July 15th <br />1 Day per wk, July 16th to Jan 31 st <br />2.7 Santiago Park: 5 Days per wk year round <br />3.0 Field Composition Mix ( Brickdust) To Be Used When Maintaining In- fields, <br />3.1 Field In General <br />3.1.1 When adding field composition mix (brickdust) to any City of Santa Ana infield, <br />the specific type of material to be used is: <br />Stabilizer Solutions Stabilizer Gold infield Mix (with stabilizer). <br />3.2 Pitcher's Mound/Home, Plate /Basepath Areas <br />3.2.1 When adding a mix with a higher clay composition material to any pitcher's <br />mound/home plate/base -path area, the specific type of material to be used is: Hill <br />Topper Home Plate and Mound Mix. <br />3.3 Warning Track <br />3.3.1 When adding field composition mix to ball diamond warning tracks the specified <br />type of material to be used is: Stabilizer Solutions Stabilizer Warning Track Mix. <br />4.0 Equipment <br />The contractor shall provide and have "on hand" at all times during the brickdust maintenance operation <br />the following equipment. <br />4.1 Utility Vehicle <br />Small tight turn radios (13') vehicle designed especially for this type of work. This vehicle shall <br />have the capability to make circle and figure eight patterns completely within the skinned <br />25�'- <br />
The URL can be used to link to this page
Your browser does not support the video tag.