Laserfiche WebLink
1.6 Portola Park- District 2 <br />1.6.1 One (1) 60' base path Girls Softball/ Little League diamond with skinned <br />brickdust irrf old. <br />1.7 Santiago Park - District 2 <br />1.7.1 One (1) 60' base path Girls Softball diamond with skinned brickdust infield. <br />2.0 Schedule of Work to be Completed <br />2.1 Cabrillo Park: 5 Days per wk, Feb 1 st to July 15th <br />1 Day per wk, July 16th to Jan 31 st <br />2.2 Delhi Park: <br />I Day per wk year round <br />2.3 Madison Park: <br />5 Days per wk, Feb 1 st to July 15 "' <br />3 Day per wk, July 16th to Jan 31 st <br />2.4 Memorial, Park: <br />5 Days per wk, Feb 1 st to July 15th <br />1 Day per wk, July 16th to Jan 31 at <br />2.5 Morrison Park <br />3 Days per wk, Feb 1st to July 15th <br />1 Day per wk, July 16th to Jan 31 st <br />2.6 Portola Park: <br />3 Days per wk, Feb 1st to July 15th <br />1 Day per wk, July 16th to Jan 31 st <br />2,7 Santiago Park: 5 Days per wk year round <br />3.0 Field. Composition Mix ( Bickdust) To Be Used When Maintaining In- fields. <br />3.1 Field In General <br />3.1.1 When adding field composition mix (brickdust) to any City of Santa Ana infield, <br />the specific type of material to be used is: <br />Stabilizer Solutions Stabilizer Gold Infield Mix (with stabilizer). <br />3,2 Pitcher's Mound/Home Plate /Basepath Areas <br />3.2.1 When adding a mix with a higher clay composition material to any pitcher's <br />mound/home plate/base -path area, the specific type of material to be used is: Hill <br />Topper Home Plate and Mound Mix. <br />3.3 Warning Track <br />3.3.1 When adding field composition mix to ball diamond warning tracks the specified <br />type of material to be used is: Stabilizer Solutions Stabilizer Warning Track Mix, <br />4.0 Equipment <br />The contractor shall provide and have "on hand" at all times during the brickdust maintenance operation <br />the following equipment. <br />29 -ib 4 <br />