Laserfiche WebLink
8.0 SUBSTITUTIONS <br />8.1 Whenever a specific type of material is specified, no substitutions shall be allowed <br />without written consent of the SAPRF representative. <br />9,0 CERTIFICATION & APPLICATION OF MATERIALS <br />9.1 All materials shall be delivered on the site in original containers. Materials shall be <br />subject to inspection by the Director's Representative. The Director's Representative <br />will not approve materials not meeting the SAPRF standards, and Contractor shall return <br />any such non- satisfactory items at his/her cost. <br />9.2 No materials shall be applied prior to the Director's Representative verifying the <br />specified quantities of materials. Furthermore, should the Contractor apply materials <br />before the Director's Representative verifites correct materials and quantities, the <br />Contractor shall not receive credit for the applied materials. The Contractor shall then <br />reorder and deliver the materials, thereby not receiving credit for the applied materials. <br />10.0 SOUND CONTROL REQUIREMENTS <br />10.1 The Contractor shall comply with all local sound control and noise level rules, <br />regulations and ordinances that apply to any work performed pursuant to the Contract. <br />Each internal combustion engine used for any purpose on the job or related to the job <br />shall be equipped with a muffler of a type recommended by the manufacturer of such <br />equipment, No internal combustion engine shall be operated on the project without said <br />muffler. Full compensation for conforming to the requirements of this section shall be <br />considered as included in the prices paid for the various contract items of work involved <br />and no additional compensation will be allowed therefore, Sounds, such as loud music, <br />that are not related to the project, shall be kept at levels so as to not disturb the general <br />public. <br />11.0 NOTIFICATION OF LOCATIONS OF WORK <br />11.1 The Contractor shall notify the Director's Representative when the contractor's crews <br />will be working within the SAPRF. Said notifications will be made on a daily basis by <br />telephone, cell phone, fax, or by weekly written schedules which specify the entire weeks <br />work locations. <br />12.0 WORK FORCE <br />12.1 The Director's Representative may evaluate each of the Contractor's staff and if he /she <br />finds that a Contractors employee or sub - contractor's employee is not performing to the <br />satisfaction of the Director's Representative, the Director's Representative shall require <br />the Contractor to remove the employee from work sites at his or her discretion within 24 <br />hours of written notice, <br />13.0 MATERIALS <br />2 ''V3 <br />