Laserfiche WebLink
CITY OF SANTA ANA CIVIC CENTER FACILITIES STRATEGIC PLAN <br />WATER SUPPLY ASSESSMENT <br />Water Demands <br />The following is a summary of the water demands for the proposed FSP Project: <br />Table 2: Water Dentands by Phase <br />Phase <br />Average Day <br />(gallons per da <br />Average Dentand <br />(AF/ r) <br />Phase 1 <br />203,040 gal/day <br />227 AF /yr <br />Phase 2 <br />203,040 gal /day <br />227 AF /yr <br />Phase 3 <br />169,920 gal /day <br />191 AF /yr <br />Phase 4 <br />1 172,800 gaUday <br />194 AF /yr <br />Total <br />748,800 gal/day <br />839 AF /yr <br />Based on the hydraulic model of the existing water system (2015), the Project Site currently has an <br />average day water demand of 62,000 gallday. <br />The following is a summary of the additional water demands the proposed FSP Project will have per <br />phase on the City of Santa Ana's water system: <br />Table 3: Additional Water Demands by Phase <br />Phase <br />Additional <br />Average Day <br />( allons per da) <br />Additional <br />Average Demand <br />AF! r) <br />Phase 1 <br />141,040 gal /day <br />158 AF /yr <br />Phase 2 <br />203,040 gal /day <br />227 AF /yr <br />Phase 3 <br />169,920 gal /day <br />191 AF /yr <br />Phase 4 <br />172,800 gal /day <br />194 AF /yr <br />Total <br />686,800 gal /day <br />770 AF /yr <br />