My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO - CIVIC CENTER WATER SUPPLY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
01/17/2017
>
55B - RESO - CIVIC CENTER WATER SUPPLY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 4:09:20 PM
Creation date
1/12/2017 3:53:26 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55B
Date
1/17/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2015 URBAN WATER MANAGEMENT PLAN <br />The City relies on a combination of imported water, local groundwater, and recycled water to meet its <br />water needs. The City works together with two primary agencies, Metropolitan and OCWD to ensure a <br />safe and reliable water supply that will continue to serve the community in periods of drought and <br />shortage. The sources of imported water supplies include water from the Colorado River and the SWP <br />provided by Metropolitan. <br />The City's main source of water supply is groundwater from the OC Basin. Imported water and recycled <br />water make up the rest of the City's water supply portfolio. Currently, the City relies on approximately 71 <br />percent groundwater, 28 percent imported water, and 1 percent recycled water. The City's water supply <br />portfolio is expected to change slightly to 70 percent groundwater, 29 percent imported water, and 0.7 <br />percent recycled water by the year 2040. The sources of imported water supply include the CRA and the <br />SWP. The City's projected water supply portfolio is shown on Figure 3 -1. <br />100% 1 t -7320 i <br />90% - 10,779 11,595 '11,677 11,673 11,691 <br />80% <br />70% <br />60% <br />50% _ <br />40 % :1 28,025 <br />30% <br />20 "/° <br />10% <br />0% <br />2020 2025 2030 2035 2040 <br />■Groundwater Eimported ■Recycled Water <br />Figure 3 -1: Water Supply Sources in the City (AF) <br />The following sections provide a detailed discussion of the City's water sources as well as the future <br />water supply portfolio for the next 25 years. Additionally, the City's projected supply and demand under <br />various hydrological conditions are compared to determine the City's supply reliability for the 25 year <br />planning horizon. <br />arcadis.com l�1 3 -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.