My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERIMETER SECURITY GROUP, LLC
Clerk
>
Contracts / Agreements
>
PROJECTS
>
PERIMETER SECURITY GROUP, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2017 12:51:00 PM
Creation date
1/17/2017 12:48:32 PM
Metadata
Fields
Template:
Contracts
Company Name
PERIMETER SECURITY GROUP, LLC
Contract #
16-4509
Agency
Public Works
Council Approval Date
10/18/2016
Destruction Year
2021
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TV* <br />G <br />1P as vC liT3 R SF:u^.Vm xrY C,'P_ca Ldt, <br />innavoylan 6h xpu yqh ilry lepra%lory <br />Date: 9/8/16 Proposal:160908GG2 <br />Project: SAPID South Gate Security Improvements Regards: TT212E and Accessories Installation <br />Thank you for allowing Perimeter Security Group the opportunity to work with you on securing your facility's <br />needs. The following serves as our proposaI: <br />SCOPE OF WORK: <br />Furnish and install Delta Scientific TT212E beam barrier. Replace existing slide gate operators. Furnish and instal <br />new Sx7 guard booth and 12ft spike strip. The following are components of the proposal: <br />VEHICLE BARRIER SYSTEM <br />Furnish and install (1) Delta TT212E active beam barrier in the Ingress lane <br />Furnish and Install (2) loop detectors In the Ingress lane forsafety and automated closing integration <br />Furnish and install (1)12ft section of Delta TC14 traffic spike units in the Egress lane <br />Furnish and install (2) HySecurity Slide driver 80 operators with UPS in existing location <br />Extend concrete island and relocate card reader/intercom approximately 5ft from its current location <br />Furnish and install Red/Green traffic light adjacent to barrier buttress <br />Furnish and Install (2) additional 6" pipe bollards in concrete island <br />Apply " Wait Here" pavement markings with stop line at Ingress lane <br />Furnish and Install Allied Modular 5x7 Guard booth on new concrete pad <br />Provide all commissioning and performance verification testing, for barrier system. <br />PRICE: $176,746.18 <br />PROJECT CLARIFICATIONS: <br />PSG is a WOSB with a Safety EMR of .64 <br />Price reflective of all electrical supplied to point of connection by others <br />Price reflective of all permit fees waived <br />Price reflective of existing photo eyes and safety edges being UL325 compliant <br />Price reflective of using exist communication to reader/intercom <br />Price does not include relocation of any existing utilities <br />Price Is reflective of using Davis Bacon Wages <br />Attached Standard Terms and Conditions apply <br />Perimeter Security Group, we pride ourselves on value -engineered design to ensure meeting client's expectations <br />and budget. We are flexible on our scope of work and willing to work with you on our price and scope to provide <br />a service that works for your company. <br />If you have any questions, please feel free to call me. <br />Garrett Gustason <br />California Operations <br />213-808-9417 <br />STANDARD TERMS AND CONDITIONS <br />This quotation is based on equipment shown on the contract drawings and Specifications <br />Perimeter Security Group <br />Garrett Gustason, California Operations <br />C-213-808.9417 - Email: ggustasort@perimotersecuritygioup.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.