My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (9)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2017 1:45:40 PM
Creation date
1/17/2017 1:22:40 PM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA PROFESSIONAL ENGINEERING, INC.
Contract #
16-6870
Agency
Public Works
Council Approval Date
12/6/2016
Destruction Year
2021
Notes
PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITE' OF SANTA ANA Exhibit 2 <br />INSTRUCTIONS TO BIDDERS <br />PROJECT NO.: 16-6870 <br />SAFE ROUTES TO SCHOOL ENHANCEMENTS FOR HENINGER ELEMENTARY <br />STATE PROJECT NO: ATPL- 5063(159) <br />INSTRUCTIONS TO BIDDERS FOR PROPOSAL SUBMISSION <br />INTENT OF PROPOSAL <br />The purpose of this Proposal is to identify a Prime Contractor to enter into a contract with the <br />City of Santa Ana, referred to as AGENCY, to complete the Work shown on the Contract <br />Documents. <br />PROPOSAL <br />The Proposal shall be submitted in accordance with the Notice Inviting Bids and shall be <br />accompanied by the following documents: <br />1. Bid Proposal 1`1// <br />2. Bidder's Statement <br />3. Contractor's Licensing and Registration Statement <br />4. Prevailing Wage Complicynce and Monitoring Statement Pr' <br />S. Ownership APf davit <br />6. Bid Bond O <br />7. List ofSub-Contractors <br />8, References =% <br />9. Additional References <br />10. Non -Collusion Affidavit <br />11. Non -Discrimination Certificate <br />12. Statement Regarding Apprenticeship Requirements j <br />13. Statement Regarding "Anti-Kickback"Requirements <br />14. Public Contract Code Section 10162 Questionnaire ,/ <br />The Proposal may be considered non-responsive if any of these documents or forms is not <br />included. The bid package shall be submitted as instructed in the Notice Inviting Bids. It is the <br />BIDDER'S responsibility to ensure delivery of the Proposal to the location and prior to the bid <br />opening hour stipulated in the Notice Inviting Bids. Late Proposals will not be considered. <br />CALIFORNIA STATE LABOR CODE <br />As outlined in the Notice Inviting Bids, this project is subject to compliance monitoring and <br />enforcement by the State of California Department of Industrial Relations, per Section <br />1771.4.a.1. BIDDERS are required to inform themselves filly of the conditions relating to <br />construction and labor under which the work will be performed. Any contract entered into <br />pursuant to this notice will incorporate the provisions of the California State Labor Code, Per <br />Section 171.4.a.2, Contractors are required to post job site notices, as prescribed by regulation, <br />EXAMINATION OF CONTRACT DOCUMENTS AND PROJECT SITE <br />BIDDERS shall satisfy themselves by personal examination of the work site, Contract <br />Documents including the Plans and Specifications (and by any other means as they believe <br />necessary) as to the actual physical conditions, requirements, and difficulties under which work <br />must be performed. <br />vii <br />
The URL can be used to link to this page
Your browser does not support the video tag.