My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (10)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2018 1:49:32 PM
Creation date
1/17/2017 1:43:26 PM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA PROFESSIONAL ENGINEERING, INC.
Contract #
16-6872
Agency
Public Works
Council Approval Date
12/6/2016
Destruction Year
2021
Notes
PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL, <br />PROJECT NO.: 16-6872 <br />SAFE ROUTES TO SCHOOL, ENHANCEMENTS FOR WASHINGTON ELEMENTARY <br />STATE PROJECT NO: ATFL- 5063(16 1) <br />TOTAL BASE BID $ LAVI 1 111 :', cj � <br />The lowest responsible bidder shall be selected based on the total base bid. 'file City reserves the <br />right to award the Base Bid, and any, all, or none ofthe add -alternate bid items (ifany). <br />* The quantity for this bid item is shown I'or bid comparison only. This bid item shall not be <br />SUbJect to the '*25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly, <br />T This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications. <br />TIME POR COMPI E'I'ION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work, for the total base bid amaunt <br />shown above, within 60 silt working days after the commencement date stated in the Notice <br />to Proceed. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the <br />Standard Specifications, shall be $1,000 per calendar day. <br />Name of Firm California Prgfes�ional Engineeking,lne. <br />Signature of BIDDER tan tVC5u. <br />Title President, Secretary, Treasurer, Manager <br />(If an individual, so state. If a firm or eo-partnership, state the firm name and give the names of <br />all individual co-partners composing the firm. If corporation, state legal name of corporation, <br />and names of President, Secretary, Treasurer and Manager, thereof.') <br />P-3 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.