My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (10)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
CALIFORNIA PROFESSIONAL ENGINEERING, INC. (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2025 2:35:49 PM
Creation date
1/17/2017 1:43:26 PM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA PROFESSIONAL ENGINEERING, INC.
Contract #
16-6872
Agency
Public Works
Council Approval Date
12/6/2016
Expiration Date
11/28/2018
Destruction Year
2021
Notes
PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOND NO, 5001.4400 <br />BOND PREMIUM IS $6,591.00 WHICH IS SUBJECT TO CHANGE BASED ON FINAL CONTRACT PRICE <br />CITE' OF SANTA ANA <br />BONDS <br />PROJECT NO.: 16-6672 <br />4':. <br />KNOW ALL MEN BY THESE PRESENTS that California Professional Engineering Inc. <br />as CONTRACTOR, and Allied World Insurance Companv <br />a corporation, organized and existing under the laws of the State, and duly authorized to transact <br />business under the laws of the State of California, as SURETY, are held and firmly bound unto <br />the City of Santa Ana, as AGENCY, in the penal sum of Four Hundred Fifty Seven Thousand Seven <br />Hundred Eleven and 751100 Dollars <br />($ 457,711.75 ), which is 100 percent of the total contract amount for the above stated <br />project, for the payment of which sum, CONTRACTOR and SURETY agree to be bound, jointly <br />and severally, firmly by these presents. <br />THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas CONTRACTOR has <br />been awarded and is about to enter into the annexed Contract Agreement with AGENCY dated <br />December 6, 2016 for Safe Routes to School Enhancements at Washington Elementary <br />if CONTRACTOR faithfully performs and fulfills all obligations in the performance of the Work <br />of Improvement to be done under said Contract Agreement in the manner and time specified <br />therein, then this obligation shall be null and void, otherwise it shall remain in full force and <br />effect in favor of AGENCY; provided that any alterations in the obligations or time for <br />completion made pursuant to the terms of the contract documents stall not in any way release <br />either CONTRACTOR or SURETY, and notice of such alterations is hereby waived by <br />SURETY. <br />IN WITNESS WHEREOF the parties hereto have set their names, title, hands, and seal this <br />8th day of December 20 16 . <br />CONTRACTOR* California Professional Engineerinn Inc — Li <br />e n, <br />SURETY* Allied World Insurance <br />Subscribed and sworn to before yi'yz <br />phis day of <br />20—.// <br />Signature: .� ... .�. <br />Notary Public in and for the County of <br />State of _ <br />Rate of premium on this bond is $ 14.40 <br />per thousand. <br />Total amount of premium charge is $ 6,591 .00 <br />. To be filled in by Surety <br />*Provide CONTRACTOR / AD1117TED SURF7T name, <br />address, and telephone number and the <br />name, title, address, and telephone number of authorized representative. <br />Contractor: Surety: <br />Agent: <br />California Professional Engineering Inc. Allied World Insuranoe Company <br />The Bond Exchange and Insurance Agency <br />929 Otterbein Avenue, Ste. E 550 S. Hope Street, Suite 1825 <br />24800 Chrisanto Drive, Suite 160 <br />La Puente, CA 91748 Los Angeles, CA 90071 <br />Mission Viejo, CA 92691 <br />626.810-1338 213-416.1453 <br />949-461-7000 <br />I of <br />
The URL can be used to link to this page
Your browser does not support the video tag.