My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - OCTA STREETCAR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
02/07/2017
>
25F - AGMT - OCTA STREETCAR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2017 3:40:35 PM
Creation date
2/2/2017 3:10:22 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
2/7/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />COOPERATIVE AGREEMENT NO. C -6 -1433 <br />between the AUTHORITY and the CITY which will document the terms and conditions pursuant to <br />which the OC Streetcar Project will be constructed. <br />D. "Contractor" means any contractor or consultant who executes an agreement with the <br />AUTHORITY for design and /or construction activities related to the OC Streetcar Project. <br />E. "Design Agreement" means Cooperative Agreement C -5 -3583 between Authority and <br />CITY for the design phase of the OC Streetcar Project, dated May 9, 2016, which sets forth the <br />terms and conditions to which the OC Streetcar Project will be designed. <br />F. "Effective Date" means the date this Agreement is executed by both Parties. <br />G. 'Occupied City ROW" means that portion of City ROW to be physically occupied by <br />OC Streetcar System improvements in accordance with this Agreement, the Design Agreement, the <br />Construction Agreement, and Project Submittals. <br />H. "OC Streetcar Proiect" or "Project" means the planning, design, financing, <br />construction, and installation of the OC Streetcar System as set forth in the Design Agreement <br />and /or Construction Agreement. The OC Streetcar Project becomes the OC Streetcar System upon <br />initiation of Revenue Service. <br />I. "OC Streetcar System" means the OC Streetcar passenger transportation system to <br />be owned, operated, and maintained by the AUTHORITY including all tracks, stations, streetcar <br />vehicles, conduits, electrical lines, traction power poles, traction power substations, cross -span <br />wires, streetcar signal equipment, maintenance facilities, and other functionally related and <br />appurtenant equipment and facilities, <br />J. "Operations and Maintenance Agreement" means the cooperative agreement to be <br />entered into between the AUTHORITY and the CITY establishing the roles, responsibilities, and <br />expectations with respect to the operations and maintenance of the OC Streetcar System. <br />K. "Plans and Specifications" means the Project plans, specifications, and special <br />provisions prepared by the AUTHORITY providing the information necessary to construct the Project <br />Page 3 of 13 <br />F; \SG &A \SG &A Client Folders \5 - HDR Engineering \05,09.15 - OCTA- Program Management \Work Tasks \1 - Agreements\11 - SA Use <br />Agreement\ - Final \AG61433 - 20161215 OCSC ROW Use Agreement - SA - Final - Updated.docx <br />25F -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.