My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
80A - JOINT - LOAN AGMT AMCAL
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
02/07/2017
>
80A - JOINT - LOAN AGMT AMCAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2017 4:09:44 PM
Creation date
2/2/2017 3:55:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
80A
Date
2/7/2017
Destruction Year
2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
any line item in the Project Budget exceeds the amount allocated to that line item in the Project <br />Budget, (b) Project costs for any matters not covered by a specific line item have been or will be <br />incurred, or (c) the undisbursed portion of the Loan proceeds and all other approved financing <br />sources are or may be insufficient to pay all construction of the Project that may be payable <br />under the Inclusionary Loan Documents or otherwise in connection with the construction, <br />Developer shall, within ten (10) days after it receives written notice thereof from City of any of <br />the foregoing matters, do one or more of the following: <br />(a) provide satisfactory evidence to City that Developer has previously paid <br />such excess or otherwise provided for such insufficiency (collectively, the "Excess Cost ") with <br />fiords from a source other than the Inclusionary Loan; <br />(b) reallocate sufficient funds to pay the Excess Cost from funds allocated to <br />"Contingency" in the Project Budget; provided, however, that the City Project Manager's consent <br />to any such reallocation shall be required; or <br />(c) deposit an amount equal to the Excess Cost in a non - interest bearing <br />account (the "Overrun Account ") with City from which withdrawals may be made only with the <br />consent of the City Project Manager but which will be exhausted prior to any further <br />disbursement for any line item, so that any resulting surplus in any line item of the Project <br />Budget will then be reallocated to the line item(s) in which the Excess Costs are expected to be <br />incurred. <br />City shall have no obligation to make further disbursements until Developer has paid or <br />otherwise provided for the overrun as required above. Amounts deposited by Developer in the <br />Overrun Account for any Excess Costs shall be disbursed by City prior to the disbursement of <br />any remaining Loan proceeds in the manner described in subsection 9.3(c). <br />6.11 Cost Savings. Upon completion of and disbursement for all matters covered by <br />any line items in the Project Budget, any remaining undisbursed amounts allocated to that line <br />item shall be reallocated to "Contingency" and thereafter be available for disbursement in <br />accordance with the terms of this Agreement. <br />6.12 Retainage. City will withhold a Retainage of 10% from each Disbursement <br />for each of the Hard Cost line items of the Project Cost Breakdown (and other line items thereof <br />designated for withholding of retainage) until all conditions to the final Disbursement of Hard <br />Costs have been satisfied. In lieu of City's withholding Retainage, Developer can by written <br />notice to City elect not to draw any overhead or profit as would otherwise be permitted under the <br />Construction Contract until such time as Retainage would otherwise have been released. <br />City shall not retain funds for building materials purchased by Developer for which <br />Developer supplies documentation to City proving payment in full, land acquisition costs or for <br />soft costs. <br />6.13 Holdback. The retainage otherwise available for disbursement shall be subject to <br />a holdback of one hundred twenty -five percent (125 %) of the estimated cost (as determined by <br />14 <br />80A -20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.