My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2017-02-07
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
02/07/2017
>
FULL PACKET_2017-02-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 5:41:42 PM
Creation date
2/2/2017 5:25:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
2/7/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1066
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUMMARY OF REHAB WORK <br />2151,E. First Street <br />Santa Ana, CA <br />SITE & BUILDING EXTERIOR <br />• Re -surface asphalt paving. <br />• Replace sidewalks. <br />• Replace patio and front yard landscaping and Irrigation system. <br />• Install patio furnishings. <br />+ Repair existing stairs and railing. <br />• Replace coating on balconies, <br />• Install new accessible mailboxes. <br />Install new signage. <br />• Install new doors. <br />• Replace material on mansard walls. <br />• Remove brick veneer on exterior walls. <br />INTERIOR <br />• Reconfiguration Into a 72-unit complex. <br />• Paint all units. <br />• Install new ADA flooring, <br />• Install new bathroom accessories. <br />• Install new cabinets. <br />• Install new windows and window coverings. <br />• Install new doors. <br />• Remodeling of office and community room. <br />25C-54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.