My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KOA CORPORATION ("KOA") - 2016
Clerk
>
Contracts / Agreements
>
K
>
KOA CORPORATION ("KOA") - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2017 10:41:10 AM
Creation date
2/3/2017 4:25:25 PM
Metadata
Fields
Template:
Contracts
Company Name
KOA CORPORATION ("KOA")
Contract #
A-2016-372
Agency
PLANNING & BUILDING
Council Approval Date
12/20/2016
Expiration Date
12/31/2017
Insurance Exp Date
3/13/2017
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Trip Distribution and Roadway Assignment <br />• Ultimate Build -out Scenario, Using the Latest OCTA Traffic Model (OCTAM) to Produce a Long Range <br />Condition Baseline <br />Traffic Impact Analysis <br />Existing Conditions (2016) <br />Existing plus Project Conditions (2016) <br />Opening year without Project Conditions <br />Opening year with Project Conditions <br />* Future Project Design Year without Project Conditions <br />Future Project Design Year with Project Conditions <br />Site Access and Circulation <br />• Evaluation of Need of Additional On-site and/Off-site Traffic Controls <br />• Mitigation Measures for Intersections/Roadways with Level •of -Service Worse than a Value of "D" <br />Compliance with CEQA Guidelines <br />• Conclusions <br />TASK 5 SUBMITTAL AND REVIEW OF REPORT <br />The traffic study will be submitted to the City for review. Any proper or reasonable revisions will be <br />incorporated into the traffic study in order to be fully responsive to the scope of services. Reasonable <br />revisions include any corrections to the report within the general scope of work, but exclude any traffic <br />data collection or analysis at any locations, except as specified in our proposal. <br />TASK 6 —ATTENDANCE AT MEETINGS <br />In addition to the kick-off meeting under Task I, KOA will attend these meetings: <br />• Three progress meetings with City staff <br />• One Planning Commission General Plan & Zoning Subcommittee Meeting or Study Session <br />• One Planning Commission Hearing <br />• One City Council Hearing <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.