Laserfiche WebLink
4.4.4 Diamond or Beokson Pump: Used to remove standing water in brickdust areas. <br />Shall be plastic with flexible piston and value. <br />4.4.5 Infield Sopper with Wringer and Bucket: Used to collect standing water in <br />brickdust areas. Sopper shall be geotextile-covered sponge typical for absorbing <br />chemical spills. <br />5.0 Meetings <br />5.1 Contractor shall provide City of Santa Ana staff with a contact person and a phone <br />number to reach the contact person from the hours of 6:30am — 5:00pm, Monday — <br />Saturday. <br />5.2 Contractor shall appoint and identify to City of Santa Ana staff a "site supervisor", This <br />site supervisor shall meet with staff as requested at time and place agreed upon by both <br />parties for as long as the contract is in effect to discuss any problems/concems that may <br />arise and any goals for the week. <br />5.3 In November of each year for as long as the contract is in effect, Contractor shall <br />personally meet with staff, along with the designated site supervisor, to discuss and <br />outline schedules for "Annual Renovations" (listed in Section 10,0). <br />6.0 Daily Infield & Warning Track Maintenance <br />6.1 General <br />6.1.1 Contractor shall remove all litter, broken glass and hazardous debris from infield <br />and dugout areas. <br />6.1.2 Contractor shall keep brickdust and dugout areas in a clean and weed free <br />condition. Dugouts shall be cleaned daily and be free of brickdust, stains, weeds <br />and other debris. Dugouts shall be hosed down weekly so they are completely <br />free of any brickdust or other stains/gum, sunflower seeds, etc. <br />6.1.3 Contractor shall hose and/or sweep and hose out all dugouts so they are 100% free <br />of brickdust, brickdust stains or any other debris. <br />6.2 Mahrkenance Procedure <br />6.2.1 Retain smooth and level playing surface, using the following daily procedure. <br />The contractor shall remove all bases before beginning any work. on in -field and <br />re -install after all work on in -field is completed. <br />6.2.2 After removing all bases, the contractor shall scrape/wire brush all base post <br />anchors and base inserts. This will help facilitate the base removal and <br />installation. <br />6.2.3 The Contractor shall rake/shovel loose material from high spots back into low <br />spots/worn areas on running paths, sliding zones, and any other low spots/worn <br />areas appearing on the field before any watering or dragging shall take place. <br />6.3 Home Plate Area/Batter's Box Area Holes (follow Gail Materials home plate/pitchers <br />mound maintenance video) <br />6.3.1 Sweep/Rake away all loose brickdust-mound mix -calcine clay, <br />6.3.2 Wet area until moist. <br />6.3.3 Scarify area (`s) [batter's box hole (`s)) with shovel; This will help the mix bind <br />better, <br />