My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROFESSIONAL SPORTS FIELD MAINTENANCE, INC. (2) -2017
Clerk
>
Contracts / Agreements
>
P
>
PROFESSIONAL SPORTS FIELD MAINTENANCE, INC. (2) -2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 12:36:43 PM
Creation date
2/6/2017 9:59:30 AM
Metadata
Fields
Template:
Contracts
Company Name
PROFESSIONAL SPORTS FIELD MAINTENANCE, INC.
Contract #
A-2017-008
Agency
PARKS, RECREATION, & COMMUNITY SERVICES
Council Approval Date
1/17/2017
Expiration Date
1/31/2019
Insurance Exp Date
8/26/2019
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13.1 The Director's Representative shall approve or reject all materials delivered to the work <br />site. In addition, the Contractor shall not apply any materials until the Director's <br />Representative inspects the materials to confine they are correct per specifications. Note <br />that the Director's Representative may stay at the work site to confirm that all materials <br />are applied correctly and in the quantities specified. Materials applied by the Contractor <br />prior to the Director's Representative inspecting the materials shall be considered not <br />applied. Therefore, the Contractor shall not be given credit towards the quantity of the <br />specified material required to be applied by the specification. The Contractor shall then <br />be required to deliver the specified quantity of material to the work site and, following <br />the Director's Representatives approval, apply the materials in the presence of the <br />Director's Representative: <br />Prior to the application or use of any materials the Contractor shall submit to the <br />Director's Representative a minimum 48 hours before delivery to the work site a list of <br />all materials and/or chemicals that may be used pursuant to the terms of this Agreement. <br />The list shall include the name of the product, the products specifications, and the <br />quantity of materials, prescribed method of use/application, Material Safety Data Sheets <br />and chemical analysis where applicable, recommended usage and any other <br />manufacturer's data that may be pertinent. The list must be submitted before any <br />materials/chemicals are used pursuant to this Agreement. <br />13.1.1 The materials and chemicals utilized in furtherance of this Agreement shall <br />comply with the following standards: <br />All fertilizers shall be complete, furnishing the required percentage of nitrogen, <br />phosphoric acid and potash to keep turf, trees, shrubs and other plants in a healthy <br />and vigorous growing condition. <br />Pesticides including but not limited to: Insecticides, fungicides, herbicides, <br />algaecides, aviacides, and rodenticides shall be of the best quality obtainable and <br />available on the market, properly labeled with guaranteed analysis, and brought to <br />the job site in the manufacturer's original container. <br />Materials shall as specified herein, matching those existing at the work site, or as <br />specified by the Director's Representative. <br />13.1.2 All materials delivered to the site shall be accompanied by a packing slip or other <br />form from the vendor indicating the specific commodity delivered and the <br />quantity. <br />City Responsibilities <br />1.0 CITY -DIRECTOR'S AUTHORITY <br />The Director's Representative is the only person authorized to direct changes in any of the <br />requirements under the Agreement and, not withstanding any provisions contained elsewhere in <br />the Agreement, and said authority remains solely in the Director's Representative. In the event <br />that the Contractor effects any such changes at the direction of any person other than the <br />Director's Representative, the changes will be considered to have been made without authority <br />and solely at the risk of the Contractor, In addition, the Director's Representative shall have the <br />
The URL can be used to link to this page
Your browser does not support the video tag.