My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA - AGMT DELHI PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
02/21/2017
>
20A - AA - AGMT DELHI PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2017 2:05:33 PM
Creation date
2/16/2017 4:32:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
2/21/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A-2016.092 <br />COOPERATIVE AGREEMLNT BETWEEN THE CITY OF SANTA <br />ANA AND THE CITY OF COSTA MESA FOR THE <br />CONSTRUCTION OF THE SANTA ANA DELHI DIVERSION <br />FORCED SEWER MAIN UNDER BRIS'T'OL STREET FROM <br />BAKER TO NEWPORT BEACH BOULVARD <br />This cooperative agreement ("Agreement") is made and entered into this � day of <br />--WW--�4-- 2016, by and between the CI'T'Y OF COSTA MESA, a municipal <br />eorporatton ("COSTA MESA"), and the CITY OF SANTA ANA, a municipal corporation <br />("SANTA ANA"). <br />RECITALS; <br />A. WHEREAS, the City of Sama.Ana, Orange County Flood Control District, the County of <br />Orange, the City of Newport Beach, the City of Costa Mesa, and the Irvine Ranch Water <br />District are all parties to a separate agreement for the construction, maintenance, and <br />operation of the Santa Ana Delhi -Diversion Channel Project ("Diversion Channel <br />Project"); which is a collaborative effort to address regional water quality issues, and <br />B. WHEREAS, one aspect of the Diversion Channel Project's proposed plan is to install, <br />operate, and maintain forced sewer main pipelines within public street right-of-way of <br />COSTA MESA, and <br />C. WHEREAS, COSTA MESA agreed to contribute to the Diversion Channel Project a lump <br />sum amount of $600,000, and <br />D. WHEREAS, in a separate and different project to begin before construction of the <br />Diversion Channel Project, COSTA MESA will 'hire its own contractor to perform certain <br />work in the median on .Bristol Street within the city of COSTA MESA ("Bristol Street <br />Median Project"), and <br />E, WHEREAS, to benefit the Diversion Channel Project in terms of time and cost savings, <br />COSTA MESA is agreeable to having its contractor for the Bristol Street Median Project, <br />perform that portion of the Diversion Channel Project which calls for forced sewer main <br />pipelines to be installed within Bristol. Street between Baker Street to Newport Boulevard; <br />as shown in Exhibit A, and <br />F. WHEREAS, COSTA MESA desires, therefore, that COSTA MESA'S lump sum financial <br />obligation to the Diversion Channel Project be offset by the cost of work performed by its <br />contractor on the Bristol. Street Median Project related to installing the forced sewer nxain <br />pipeline, and <br />G. WHEREAS, SANTA ANA is agreeable to advancing to COSTA MESA the fiends required <br />to cover the costs incurred by COSTA MESA to pay its contractor on the Bristol Street <br />M'edian?rojoct to install the forcod sewer main,pip.eline ("Advanced Expended Funds"); <br />Pate I of 12 <br />EXHIBIT 1 <br />20A-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.