Laserfiche WebLink
SCOPE OF WORK: <br />Our subcontractor to furnish all labor (prevailing wages), materials, equipment, transportation, disposal, <br />services and insurance for which specifically pertains to the following project activities, <br />1 -remove asbestos containing materials per the SGS survey dated December 20, 2016 including transite <br />pipe; window putty & roof mastic <br />2 -perform lead abatement and stabilization of Items indicated per the SCS survey dated December 20, <br />2016 <br />3 -conduct a lead waste disposalcharacterization of the complete structure to determine that all waste . <br />can be disposed of as construction debris / trash <br />Work to be completed in (2-3) shifts, 8 hrs. /shift Monday -Friday <br />All work to be completed in compliance with SCAQMD, CAL OSHA, EPA and Local Regulations <br />LUMP SUM PRICE: $3,647.00 <br />25H-15 <br />