My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY OF - 2016
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY OF
>
ORANGE, COUNTY OF - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:55:37 AM
Creation date
3/3/2017 1:35:28 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY OF
Contract #
A-2016-037
Agency
Police
Council Approval Date
3/1/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
or decline and award in the ND Grants system, please see pages 40-43 in the ND Grants <br />Grantee Training 1VIanual. <br />Funds will remain on hold until the recipient accepts the award through ND Grants and <br />all other conditions of award have been satisfied, or the award is otherwise rescinded., <br />Failure to accept the brant award within the 90 day timeframe may result in a loss of <br />funds. <br />Pass through funding <br />Each state shall obligate 100 percent (100%) of its total EMPG Program allocation <br />amount to the designated state -level EMA. If the SAA is also the EMA, this requirement <br />is automatically met. If the SAA is a separate agency, or has a separate budget processes, <br />then EMPG fields must be obligated to the EMA within 15 days of the grant award date. <br />In instances where the state EMA is making sub -awards to local jurisdictions, FEMA <br />expects the state EMA to make these awards as expeditiously as possible, <br />Administrative and National Policy Requirements <br />Successful applicants for all DHS grant and cooperative agreements are required to <br />comply with DHSS Standard Administrative Terms and Conditions, which are available <br />online at: dttn,//tivv4tiv.clh.s,Dov/flirhliecrti0n/fy75-clh.s�sGcrncic�YclMt�rrns-and�cartr'litaarzs. <br />Before accepting the award the authorized official should carefully read the award <br />package. The award package contains instructions on administering the grant award, as <br />well as terms and conditions with which the recipient must comply. Recipients must <br />accept all the conditions in this NOFO as well as all Terms and Conditions in the Notice <br />of Award to receive an award under this program. <br />Reporting <br />Recipients are required to submit various financial and programmatic reports as a <br />condition of their award acceptance. Future awards and fund drawdowns may be <br />withheld if these reports are delinquent. <br />Federal Financial Reporting Requirements <br />Federal Financial Report (FFR) <br />Recipients must report obligations and expenditures on a quarterly basis through the FFR <br />(SF -425) to FEMA. Recipients must file the FFR electronically using the Payment and <br />Reporting S ystem (PAILS). An FFR must be submitted quarterly throughout the period of <br />performance, including partial calendar quarters, as well as for periods where no grant <br />award activity occurs. The final. FFR is due 90 days after the end date of the performance <br />period. Future awards and fund drawdowns may be withheld if these reports are <br />delinquent, demonstrate lack of progress, or are insufficient in detail. Recipients may <br />review the FFR Form (SF -425) at: <br />yti��.�vhitehv�rs�.rY«��lsr.'lcs/clefctrtlt/files/oyral�/ canis/ r�prm,ecl�fc3t�rt.�/Sr 42 <br />SF -425 OMB 9-00348-0061. <br />15 <br />FY 2015 EMPG Program <br />
The URL can be used to link to this page
Your browser does not support the video tag.