My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY OF - 2016
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY OF
>
ORANGE, COUNTY OF - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 9:55:37 AM
Creation date
3/3/2017 1:35:28 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY OF
Contract #
A-2016-037
Agency
Police
Council Approval Date
3/1/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
What's New? • The 2 CY2, Pant 200 — Uniform Administrative Requirvnents, Cost Principles, andAudit <br />Requirements,for Federal Awards ("Super Circular" or "Otani Circular") supersedes all <br />inconsistent provisions found in other administrative requirements, program manuals, <br />handbooks, and other non -regulatory materials (see 2 C.F.R. § 200.105). <br />• Subrecipients are responsible for costs incurred to comply with FEMA's Environmental <br />Planning and Historic Preservation (EHP) requirements. This includes, but is not limited to, <br />California Historical Resources Information System (CHRIS) reports; when required. See <br />Information Bulletin (IB) 404. <br />Indirect costs are allowed under the FYI EMPG subaward, as described on page 2 of this <br />State Guidance, <br />• The FYI EMPG-specific Financial Management Forms Workbook (FMFW) has been <br />updated. Updates include, but are not limited to, a revised Grant Subaward Face Sheet <br />which includes additional fields; and new Indirect Cost -related tabs. <br />EMPG The FYI 5 EMPG Program will focus on the builcling, sustainmant, and delivery of all -hazards <br />Program emergency management capabilities in the following areas: <br />Emphasis• Planning <br />• Organization <br />• Equipment Acquisitions <br />• Training <br />• Exercises <br />• EOC Construction and Renovation <br />• Maintenance And Sustainment <br />The FY 15 EMPG Program plays an important role in the implementation of the rational <br />Preparedness System (rPS)7 by supporting the development and sustainment of core <br />capabilities, Core capabilities are essential for the execution of each of the five mission areas <br />outlined in the National Preparedness Goal (NPG). The developtnent and sustainment of these <br />core capabilities are not exclusive to any single level of government or organization, but rather <br />require the combined effort of the whole community. The FYI EMPG Program sulaporis all <br />core capabilities in the Prevention, Protection, Mitigation, Response, and Recovery mission <br />areas based on allowable costs. <br />7 The National Preparedness System can be located at: htttpr /Nyww fur�la,Lyov/�iatioi7nl-p reparerl.ness�-system <br />[4] <br />
The URL can be used to link to this page
Your browser does not support the video tag.