My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LONEROCK INC. (SANTA ANA DELHI CHANNEL DIVERSION PROJECT)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
LONEROCK INC. (SANTA ANA DELHI CHANNEL DIVERSION PROJECT)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2025 12:46:52 PM
Creation date
3/16/2017 12:13:46 PM
Metadata
Fields
Template:
Contracts
Company Name
LONEROCK INC. (SANTA ANA DELHI CHANNEL DIVERSION PROJECT)
Contract #
16-6467
Agency
Public Works
Council Approval Date
12/6/2016
Expiration Date
1/1/1900
Notes
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />Vicente Sarmiento <br />COUNCILMEMBERS <br />Angelica Amezcua <br />P. David Benavides <br />Michele Martinez <br />Roman Reyna <br />Sal Tinajero <br />CITY OF SANTA ANA <br />20 Civic Center Plaza • P.O. Box 1988 M-36 <br />Santa Ana, California 92702 <br />(714)647-5013 <br />www.santa-ana.0M <br />July 22 2016 <br />TO: CONSTRUCTION CONTRACT BIDDERS <br />SUBJECT: PROJECT NO. 16-6467 SANTA ANA DELHI CHANNEL DIVERSION PROJECT <br />ADDENDUM ONE <br />The following change and clarification has been made to the subject Contract Documents: <br />CITY MANAGER <br />David Cavazos <br />CITY ATTORNEY <br />Sonia R. Carvalho <br />CLERK OF THE COUNCIL <br />Maria D. Huizar <br />A Mandatory Pre -Bid Meeting will be held Thursday, August 11, 2016, 2PM, at the project site. See <br />attached map for the exact location. <br />2. Bid Opening is changed from August 9, 2016 to September 1, 2016; time and location stay the same. <br />3. Add the following to Section 1-2 Terms & Definitions: <br />Parties - Cities of Santa Ana, Newport Beach, and Costa Mesa, County of Orange, and Irvine Ranch <br />Water District. <br />4. Add the following to Section 2-5.3.1 General: <br />2-5.3.1.1 ELECTRONIC SUBMITTAL PROCEDURES <br />A. Summary: <br />1. Shop drawings, product data submittals, and closeout documentation shall be transmitted to <br />City in electronic (PDF) format using Submittal Exchange; which is a website service <br />designed specifically for transmitting submittals between construction team members. <br />2. The intent of electronic submittals is to expedite the construction process by reducing <br />paperwork, improving information flow, and decreasing turnaround time. <br />3. The electronic submittal process is not intended for color samples, color charts, or physical <br />material samples; those shall be submitted separately to the City. <br />B. Procedures: <br />1. Submittal Preparation <br />■ Contractor shall convert all submittals to an electronic (PDF) submittal with the City <br />provide submittal cover page. <br />2. Contractor shall complete in its entirety the City submittal cover page, review submittal for <br />accuracy and contract compliance, and apply electronic stamp certifying that the submittal <br />complies with the requirements of the Contract Documents including verification of <br />City of Santa Ana / Project 16-6467 Santa Ana Delhi Channel Diversion Project / REBID - October 7, 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.