My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LONEROCK INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
LONEROCK INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 9:47:30 AM
Creation date
3/16/2017 12:13:46 PM
Metadata
Fields
Template:
Contracts
Company Name
LONEROCK INC.
Contract #
16-6467
Agency
Public Works
Council Approval Date
12/6/2016
Notes
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF MAN'I'A ANA <br />I'12t9JECT NO. 16-6467 <br />SANTA ANA 191%!.111 CHANN11.191VERSION P12t'9JECT— [21^,13119 <br />PROPOSAL <br />'lite following are the names, addresses, and telephone numbers for TIiT �2EE public agencies for <br />which the 1311' DhR has perforined similar work within the past three years. <br />3 <br />xarrie and AddVess Of Mia}aic .Arreecy <br />Irvine Rench Water District <br />15600 Sand Canyon Avenue,, Irvine, CA 92618 <br />11d1t 1ctL^rlte0ebp Nu[Ikt4Cd UrtX"CSp@' @277mm SVli19 ixliC4i <br />Kevan Brandt <br />T: 949-923-5211 <br />troCCYie'+Ci NC?®l4`, a/t1CA6riY85 r-0 1114 Of 1.'1bkTbjlri7tlCi15 <br />Natural Treatment System In -Line Basins <br />in Irvine, CA <br />Completed December 2.007 <br />.�. <br />muiilW Ghpw�6ptioll Of t'ali**ct �.._.........� <br />This protect consisted of constructing cast -ire -place reinforced concrete weir structures in <br />Peters Canyon Wash Channel, San Diego Creek, and the Santa Anal Santa Fe Channel <br />(see Images # 26-36). The purpose of the weirs was to slow and divert the flow to other <br />sections of the channel. The weirs consisted of a cast -in-place reinforced concrete foundation <br />that ran up the channel slopes (image #26, 27, 29, 30, 31). Removable, sliding weir logs were <br />installed into the reinforced concrete to adjust flow rate or divert flow when needed <br />(Images # 23). Reinforced concrete modifications (Images #32-35) were also made to the <br />existing reinforced concrete channel structure to accomodate removable aluminum weir logs <br />and divert flow. <br />This protect is substantially similar to the Sante Ana Delhi Channel Diversion Project, The <br />work was in channels, that are larger in size than the Santa mita Delhi Channel and experience <br />much grester flow (linage # 27, 31,36). over 1,5541 CY of cast -In-place reinforced concrete <br />+,vera required, which Is more than the requirment for the Santa Ana Delhi Project. The scope <br />and type of the project was similar to what is required for the Santa Ana Delhi Channel. <br />Cast -in -Place reinforced concrete' structures with metal pieces were required to modify <br />portions of the channels (similar to the Santa Ana Delhi Channel) to divert flow that was even <br />greater than what will be expected for the Santa Ana. Delhi Channel (Images # 27, 29 31, 35, <br />36). <br />For the reasons mentioned above„ this project partially satisfies the minimum experience <br />requirements for the Santa Ana Delhi Diversion Project. It satisfies 7 months of the required <br />5 years experience within the last ten years in reinforced concrete flood control channels and <br />structures, it also satisfies one of the required two projects in the last 15 years in reinforced <br />concrete frond control- The project satisfies the: requirement of one project with a flow <br />diversion structure (in this case many). <br />Included as supplementary Images are #37, 38 which show a project in Huntington Beach <br />finished in February 2007 which included a RC storm water channel for which a large RC <br />structure was constructed with tall walls like what Is required in the Delhi Channel. Contact <br />Doug Erdman at 714-374-1735 for more infer, on theMichael Drive Storm Drain Bypass Frit. <br />Attach 4 -,8x 10 Photographs showing each phase of -construction. <br />1-9C of Cry of &nata Aro) PlareCt 15 6467 � klf-117 Aria Ddij CIian�� M Erre ridlrin Ir"fojecr t Addencilial Ligid - October 7 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.