Laserfiche WebLink
MAYOR <br />Mrflr.Idl A. Pulido <br />MAYOR PRO i"EM <br />Vicente Sarmiento <br />GCUNCIL.MEMB6ERS <br />Angelica Anaenue <br />P, ow.nd 43€+rmawide5 <br />midlee Maher <br />Ramon Reyna <br />Sal Tlra"Ilnm <br />October 7, 2016 <br />Y r! r _ ZINittrjUMM <br />CITY OF SANTA ANA <br />20 CrAv, C.enlgr Plaza . P,O, flux $388 Put -36 <br />SAnto Ana, CnliforNa 92762. <br />(Ptd) 6474013 <br />rivrot adYrkta.cgttl <br />TO: CONSTRUCTION CONTRACT BIDDERS <br />CITY MANAGER <br />Dimal cavazas <br />CITY ATTORNEY <br />Sonia Rt Cmaihn <br />CLERK OF V,IE COUNCIL. <br />Maria 0 Hulm <br />SUBJECT: PROJECT NO, 16-6467 SANTA ANA -DELI -II CHANNEL DIVERSION <br />k,7 / '2 (�,I <br />The following changes have been made to the plans and specifications of the subject project. <br />1. The Original Contract Documents and Addendums 1„ 2, 3, 4, a, 6, and 7 contain no changes. <br />Addendum 8 contains all changes with respect to the 'REBID". <br />2. Replace the Notice Inviting gids with the attached REBID Notice Inviting Bids. <br />3. Amend Addendum Seven Special Provisions 3.00 Traffic Control with the attached Costa <br />Mesa Traffic Control Phasing plan. <br />4. Rename 'Special Provision Section 4.00 entitled "Special Provisions -- Storm Channel <br />Diversion Structure" as follows: <br />:Channel Modifications <br />5. Replace special Provision 'Section 4.01 entitled "Cenerar in its entirety with the following: <br />4,01 General <br />The CONTRACTOR responsible for the construction of the storm Channel Diversion <br />Structure and the Flood Control Channel Modifications shall have a minimum of five years <br />history and experience, within the last ten years, constructing (1) Reinforced concrete flood <br />control channels, the experience shall be the same or substantially similar In size, scope, <br />and type of the flood control channel modifications for this project as depictedin the project <br />specifications, and (2) Reinforced concrete structures; the experience shall be the same or <br />substantially similar in size, scope, and type of the diversion structure for this project as <br />depicted in the project specifications. The CONTRACTOR shall have constructed and <br />satisfactorily completed a minimum of two (2) projects of reinforced concrete flood control <br />SANTA ANA CITY CODUML <br />nrvtSil++N"d'."salrtan A7'r`d�Oauz�{A'x:I 1Ir S4ri`F=g6t4€�°'Amaa IYr�lhl�s#*FussyPre�^a�IVEicsra 3'YR,y° �piyF��^«tc'.*s�:y$iva5we�r�i��� C}�ttsir�e'�ox43 <br />Mn ur PY.aon rq 7 MidY.w.wra 4rn^U3 A&,d4 ton 8 'rds+@�4 <br />S1Vk dW16""9ALkAW rm7 tk'lmee !.?: :1.t.`.0 k1:1..9iF2kW :l'-q;{kSLu'fa <br />