My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LONEROCK INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
LONEROCK INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2017 9:47:30 AM
Creation date
3/16/2017 12:13:46 PM
Metadata
Fields
Template:
Contracts
Company Name
LONEROCK INC.
Contract #
16-6467
Agency
Public Works
Council Approval Date
12/6/2016
Notes
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Airport Director — the Director of John Wayne Airport <br />Approved Plans - those Project plans, specifications, and engineering estimates <br />("PS&E" see definition below) which have been approved through the County Property <br />Permit process. Approved Plans shall also include those PS&E revisions and/or <br />contract change orders approved in writing by the Project Representatives (as defined <br />in Section 1). <br />Bond - the faithful performance bond, payment bond, or warranty bond required to be <br />provided by the Contractor pursuant to this Agreement. (collectively "Bonds) <br />CPP - the process to obtain a County Property Permit from the County of Orange. <br />CEQA — the California Environmental Quality Act (California Public Resources Code <br />§ 21000 et seq.), <br />Channel - the Santa Ana -Delhi Diversion Channel designated OCFCD Facility No. <br />FOI. <br />Cities - refers to SANTA ANA, NEWPORT BEACH, and COSTA MESA collectively <br />Claims - liabilities, actions, suits, claims, demands, losses, costs, tortious, contractual, <br />condemnation, inverse condemnation, judgments, arbitration awards, settlements, <br />damages, demands, orders, penalties, and expenses including legal costs and attorney fees; <br />including those wising from injuries to or death of persons, for damage to property, or <br />liability of any kind or nature. <br />Conceptual Report — that Diversion Structure Water Capture and Reuse Structure <br />Concept Feasibility Study dated July 8, 2013 which reviewed the technical and <br />economic feasibility of reducing pollutants inflows and trash to the Channel. <br />Contractor - that contractor and its subcontractors that have entered into a construction <br />contract with SANTA ANA for the Project, <br />Days — unless otherwise specified to the contrary, "days" in this Agreement shall mean <br />business days as defined by the City of Santa Ana. <br />Director — the Director of OC Public Works or designee. <br />Diversion Structure — an urban discharge diversion system as may be constructed near <br />the intersection of Mesa Drive and Irvine Avenue as shown on the attached Exhibit B <br />(hereinafter referred to as the "Preliminary Plans"), which shall include features that <br />Santa Ana -Delhi Channel Diversion Project Agreement D15-013 page 3 of 69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.