Laserfiche WebLink
.PROPOSAL.— November 11, 2016 <br />Diana Lehman <br />Lehman Construction, Inc. <br />lnfo@lehmahconstruction.net <br />Single Lane Closure: Set and Leave Daily - -- _- <br />Monday through Friday between the hours of 7:OOAM and 4;DOPM. <br />8 hours part to port, includes 1 technician, 1 traffic control vehicle, A arrow <br />board, and all necessary traff ic control devices based upon the scope of work. <br />Please note overtime explanation below. <br />Overtime Rate— Prevaiiing Wage M -F <br />Prevailing Wage overtime rates apply if jab exceeds 8 hours per day on the <br />Overtime Rate Standard M -F _ <br />Overtime charges apply If job exceeds 8 hours Including travel time for <br />Tsai& aw Wait Gertrude place <br />11onto Ana, CA 02705 <br />YOU Frao (800)327 -aa44 <br />Phone (714)058.8474 <br />Pax (7`14)081 1 <br />$725,00/day <br />$ 85.00/ hour/tach <br />$70.00 /hour /tech <br />• This is a preliminary quote based on the details provided, it Is subject to change if <br />the scope of work changes. <br />• Payment terms: Prepaid. <br />• Proposal valid 30 days. <br />Thank you for the opportunity to present this proposal, We look forward to working with you on . <br />this project. If you require additional information or have any questions, please do not hesitate <br />to give us a call. <br />Sincerely, <br />Made Hurst <br />