Laserfiche WebLink
COST ANALYSIS <br />CONSTRUCTION OF PROJECT NO. 14 -7513: PACIFIC ELECTRIC PARK <br />Construction Contract <br />$ <br />1,998,650.00 <br />Contract Administration <br />$ <br />87,783.00 <br />Inspection and Testing <br />$ <br />115,822.00 <br />Contingencies <br />$ <br />214,436.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />2,416,691.00 <br />EXHIBIT 4 <br />23A -77 <br />