My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - ELECTRIC PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
03/21/2017
>
23A - PROJ - ELECTRIC PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2017 4:00:09 PM
Creation date
3/16/2017 3:49:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
3/21/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 14 -7513 <br />PACIFIC ELECTRIC PARIC <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />14 <br />8" CONCRETE MOWCURB .AT <br />180* <br />LF <br />$ <br />$ <br />TUBE STEEL FENCE <br />18.00 <br />3,240.00 <br />15 <br />CONCRETE TERRACED <br />100* <br />LF <br />$ <br />$ <br />SEATING <br />306.00 <br />30,600,00 <br />16 <br />6' HIGH TUBULAR STZ EL <br />160* <br />LF <br />$ <br />$ <br />FENCING AND GATES <br />303.00 <br />48,480.00 <br />17 <br />W HIGH PERIMETER <br />460* <br />LF <br />$ <br />$ <br />MASONRY WALL <br />390.00 <br />179,400.00 <br />18 <br />30" HIGH .MASONRY WALL <br />40* <br />LF <br />$ <br />$ <br />WITH TUBE STEEL FENCING <br />240.00 <br />9,600.00 <br />19 <br />BRIDGE <br />2 <br />EA <br />$ <br />$ . <br />5,891.00 <br />11,782.00, <br />20 <br />COMMUNITY GARDEN <br />1 <br />LS <br />$ <br />$ <br />RAISED PLANTER BIDS <br />22,843.00 <br />22,843.00 <br />21 <br />RESTROOM BUILDING <br />I <br />LS <br />$ <br />$ <br />298,112.00 <br />298,112.00 <br />22 <br />SITE LIGHTING <br />I <br />LS <br />$ <br />$ <br />201,592,00 <br />201,592.00 <br />23 <br />SOIL PREPARATION / FINE <br />26,550* <br />SF <br />$ <br />$ <br />GRADING <br />0.60 <br />15,930.00 <br />24 <br />IRRIGATION SYSTEM <br />1 <br />—C <br />$ <br />$ <br />95,450.00 <br />95,450.00 <br />25 <br />LANDSCAPING <br />1 <br />LS <br />$ <br />$ <br />82,313.00 <br />82,313.00 <br />26 <br />60 °CALENDAR DAY <br />1 <br />LS <br />$ <br />$ <br />LANDSCAPE & IRRIGATION <br />MAINTENANCE PERIOD <br />8,970.00 <br />8,970.00 <br />27 <br />DRY ROCK STREAMBED <br />4,500* <br />SF <br />$ <br />$ <br />7.30 <br />32,850.00 <br />28 <br />PLAYGROUND EQUIPMENT <br />1 <br />LS <br />$ <br />$ <br />216,025.00 <br />216,025,00 <br />29 <br />RESILIENT SURFACING <br />5,500* <br />SF <br />$ <br />$ <br />18.50 <br />101, 750, 00 <br />30 <br />SAND <br />20 <br />CY <br />$ <br />$ <br />340.00 <br />6,800.00 <br />31 <br />BENCHES <br />9 <br />EA <br />$ <br />$ <br />1,070.00 <br />9,630,00 <br />32 <br />PICNIC TABLES <br />4 <br />EA <br />$ <br />$ <br />1,698.00 <br />6,792.00 <br />33 <br />BIKE RACKS <br />3 <br />EA <br />$ <br />$ <br />2,283.00 <br />6,849Oo <br />P, I H.24$ <br />
The URL can be used to link to this page
Your browser does not support the video tag.