My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INTERIOR DEMOLITION, INC.-2017
Clerk
>
Contracts / Agreements
>
I
>
INTERIOR DEMOLITION, INC.-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2018 2:38:31 PM
Creation date
3/17/2017 12:15:30 PM
Metadata
Fields
Template:
Contracts
Company Name
INTERIOR DEMOLITION, INC.
Contract #
A-2017-038
Agency
Public Works
Council Approval Date
2/21/2017
Expiration Date
2/20/2020
Insurance Exp Date
6/4/2018
Document Relationships
INTERIOR DEMOLITION, INC.
(Amended By)
Path:
\Contracts / Agreements\I
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />SCOPE OF WORK <br />Introduction and Background - <br />The City of Santa Ana is issuing this Request for Proposals (RFP) to seek a qualified Demolition <br />contractor(s) to provide demolition, including asbestos abatement and hazardous materials removals, <br />services for the City of Santa Ana on an as -needed basis: From the proposals received, it is the City's <br />goal to select one or more Firms to enter into agreement(s), Approximately 50 residential and <br />commercial properties along Bristol Street (Warner to St. Andrew Place and Civic Center to 17th Street) <br />will need to be demolished by end of 2017. The total demolition services needed for this On-call <br />contract(s) is valued at approximately $2,200,000. The total amount to be expended shall be shared <br />among all contractors providing these services. <br />Scope of Services: <br />Contractor is responsible for tho payment of all applicable permits required to conduct the below scope <br />of services. The On -Call contractor shall respond with a task order quote within 5 working days of <br />receiving the request fora task order quote. Selection of a contractor to perform each task order shall <br />consider past work completion performance. <br />Demolition: <br />Contractor is responsible for demolishing and disposal/recycling of all improvements, including but <br />not limited to: foundations and footings, slabs, basement, detached garage, landscaping, fencing, <br />wails trees and all miscellaneous to clear site complete. Contractor is also responsible for grading <br />the parcel for drainage, importing and exporting fill dirt or aggregate base as needed, capping all <br />water and sewer lines, and compacting to 90% density. Prior to submitting all on-call proposals, the <br />Contractor shall visit the subject project site (including coordinating with the City for access inside <br />the building) and obtain any necessary as-builts to define an appropriate scope of work. <br />All work is to be done in accordance with all applicable federal, state and local regulations, <br />standards and codes governing demolition and any other trade work done in conjunction with the <br />demolition. Copies of all demolition permits, water and sewer cap inspection approval and a letter <br />of completion should be submitted for City's files prior to the Contractor receiving payment. <br />The Contractor shall supply all necessary labor, materials, services, insurance, permits, and <br />equipment to carry out the work in accordance with all applicable federal, state, and local <br />regulations. The Contractor at all times shalt keep the Project site free from accumulation of waste <br />materials or rubbish caused by the Contractor's operations. At the completion of each trade of the <br />work, and at final completion prior to contractor submitting the final invoice, Contractor shall <br />remove all waste materials, and rubbish from and about the project as well as tools, construction <br />equipment, machinery, and surplus materials. <br />Contractor shall hand deliver a City provided work notice letter to adjacent resident owners at least <br />one week prior to the demolition work, <br />
The URL can be used to link to this page
Your browser does not support the video tag.