SCOPE OF SERVICES
<br />Pl a m, Island Pe,k, Cq cl Cennas T115411 81 ncM1 T,'dll9. C&,0%vn,
<br />Admiral Kidd Paik On, of Long Beach
<br />Title Sheet
<br />Civil Engineering
<br />• Site Erosion Plan
<br />• Parking lot at Valencia Avenue
<br />• Horizontal and Vertical Control Plan
<br />• Grading and on -site Drainage Plan
<br />• Site Utility Plan
<br />Architectural (Gas House and Restroom)
<br />• Plans Elevations, Electrical, Plumbing details
<br />Structural Engineering Details (Gas House and Restroom)
<br />Plans, details
<br />Structural calculations
<br />Landscape Architecture
<br />• Site Layout / Construction Plans and Details
<br />(including plumbing)
<br />• Site Sections, as applicable
<br />• Planting Plans /Details /Notes
<br />• Irrigation Plans /Details /Calculations /Notes
<br />Electrical
<br />Electrical Site Plan to include lighting and electrical outlets
<br />Photometrics
<br />Location of panels, switchgear, meters
<br />Schedules
<br />Details
<br />Notes, specifications
<br />Mr��ainps - City Project Team Review Meeting
<br />( ohvei Hhiem, Construction Document submittal (90% and
<br />100 %) for plan review by Park, Recreation and
<br />Community Services Agency, Planning and
<br />Building Agency and Public Works Agency, This
<br />Construction Plan set will include technical
<br />specifications and an updated opinion of probable
<br />costs.
<br />Task 38 - Final Conch- uction Documents (100%)
<br />Construction plans, specifications, and estimate will be updated
<br />based upon city reviews. The final design package will be read-
<br />ied for bidding and construction
<br />P.gnr;rfngs; f=inal Review Meeting with city project staff
<br />, ,1" Turnover of files for city records and bidding.
<br />Dvft1 �
<br />25D -16
<br />to
<br />Lo: Rios Pn,k, City of van L,ar.
<br />Capi_=va.0
<br />Pl a m, Island Pe,k, Cq cl Cennas T115411 81 ncM1 T,'dll9. C&,0%vn,
<br />Admiral Kidd Paik On, of Long Beach
<br />Title Sheet
<br />Civil Engineering
<br />• Site Erosion Plan
<br />• Parking lot at Valencia Avenue
<br />• Horizontal and Vertical Control Plan
<br />• Grading and on -site Drainage Plan
<br />• Site Utility Plan
<br />Architectural (Gas House and Restroom)
<br />• Plans Elevations, Electrical, Plumbing details
<br />Structural Engineering Details (Gas House and Restroom)
<br />Plans, details
<br />Structural calculations
<br />Landscape Architecture
<br />• Site Layout / Construction Plans and Details
<br />(including plumbing)
<br />• Site Sections, as applicable
<br />• Planting Plans /Details /Notes
<br />• Irrigation Plans /Details /Calculations /Notes
<br />Electrical
<br />Electrical Site Plan to include lighting and electrical outlets
<br />Photometrics
<br />Location of panels, switchgear, meters
<br />Schedules
<br />Details
<br />Notes, specifications
<br />Mr��ainps - City Project Team Review Meeting
<br />( ohvei Hhiem, Construction Document submittal (90% and
<br />100 %) for plan review by Park, Recreation and
<br />Community Services Agency, Planning and
<br />Building Agency and Public Works Agency, This
<br />Construction Plan set will include technical
<br />specifications and an updated opinion of probable
<br />costs.
<br />Task 38 - Final Conch- uction Documents (100%)
<br />Construction plans, specifications, and estimate will be updated
<br />based upon city reviews. The final design package will be read-
<br />ied for bidding and construction
<br />P.gnr;rfngs; f=inal Review Meeting with city project staff
<br />, ,1" Turnover of files for city records and bidding.
<br />Dvft1 �
<br />25D -16
<br />
|