My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - DESIGN SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
04/04/2017
>
25D - AGMT - DESIGN SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 6:05:14 PM
Creation date
3/30/2017 5:32:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25D
Date
4/4/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r r <br />FEE SCHEDULE <br />David Volz Design proposes the following Not to Exceed fee schedule to provide the services identified in this <br />proposal. The tasks listed below are offered at a fixed fee for the design services for identified program elements. <br />The services included in this spread sheet are project management, park design, landscape architecture, and <br />listed support services. <br />TASK 1 - PRE DESIGN <br />A. Landscape Architect - Project Management, Pre <br />Design <br />B. Civil Engineering <br />C. Architectural / Structural Engineering <br />D. Electrical Engineering <br />TASK 2 - DESIGN DEVELOPMENT (50% PLANS) <br />A. Landscape Architect - Project Management, <br />Design Development <br />B. Civil Engineering <br />C. Architectural / Structural Engineering <br />D, Electrical Engineering <br />PR <br />LA <br />PP <br />CT <br />AD <br />Total <br />$220 <br />$193 <br />$135 <br />$121 <br />$115 <br />Hrs <br />Fee <br />8 <br />8 <br />8 <br />12 <br />2 <br />38 <br />J$ 6,066 <br />$ 5,290 <br />$ 2,523 <br />$ 631 <br />$ 14,510 <br />30 40 40 40 1 12 162 1 $ 25,940 <br />$ 17,825 <br />$ 8,503 <br />$ 2,126 <br />$ 54,393 <br />TASK 3A - CONSTRUCTION DOCUMENTS (90% PLANS) <br />A, Landscape Architect - Project Management, <br />Construction Documents 32 44 42 44 12 174 $ 27,906 <br />B. Civil Engineering $ 31,223 <br />C. Architectural / Structural Engineering $ 14,893 <br />D. Electrical Engineering $ 3,723 <br />$ 77,745 <br />TASK 38 FINAL CONSTRUCTION DOCUMENTS <br />A. Landscape Architect - Project Management, Final <br />Construction Documents 2 8 1 6 8 2 26 1 $ 3,992 <br />B. Civil Engineering $ 10,408 <br />C, Architectural / Structural Engineering $ 4,964 <br />D. Electrical Engineering $ 1,241 <br />$ 20,605 <br />Proposal to Provide Landscape Architectural Services for <br />Santiago Park Gas House, City of Santa Ana <br />25D -18 <br />2/21/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.