My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - STREETCAR DESIGN SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
04/04/2017
>
25E - AGMT - STREETCAR DESIGN SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 6:06:18 PM
Creation date
3/30/2017 5:32:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
4/4/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C -5 -3583 <br />EXHIBIT C <br />reserves the right to decline any Betterment request that materially impacts the Project <br />schedule. <br />4. All Betterment reimbursements by the CITY shall be lump sum and shall equal the agreed <br />upon budget amount. The AUTHORITY agrees to segregate the Betterment with respect <br />to accounting and cost reporting. <br />Any design work done by the AUTHORITY's Design Consultant on a Betterment, and <br />incorporated into the Plans and Specifications, shall be constructed, without exception, by the <br />AUTHORITY's Construction Contractor, as part of the Project construction effort. <br />4.2 BETTERMENT REIMBURSEMENT <br />The City's reimbursement of AUTHORITY costs associated with a Betterment shall be on a <br />lump sum basis. Each Betterment cooperative agreement shall identify the timing and methodology <br />for reimbursement. <br />5.0 CITY COSTS <br />5.1 CITY SUPPORT SCOPE <br />5.1.1 City Staff Support <br />City staffing support is CITY staff time spent in support of the Project and includes, but is not <br />limited to, administering the CITY's support efforts, Project meetings, construction package reviews, <br />site plan reviews, station and urban design participation, and public outreach efforts. The City <br />Representative is responsible for managing CITY staff support on the Project and shall ensure time <br />charged is reasonable and necessary. Support costs are for the design phase of the Project and shall <br />not include costs incurred past the notice to proceed for construction. <br />5.1.2 City Consultant Services <br />Any consultant services used by the CITY on behalf of the Project shall be coordinated with <br />the AUTHORITY. Any existing contracts the CITY intends to use for Project support must be reviewed <br />by the AUTHORITY for compliance with FTA requirements and the CITY agrees to follow the <br />55Exhibit C <br />2 <br />L:1 Camm1 CLERICALIWORDPROC�AGREE�AG53583 correcCe 97.dom <br />
The URL can be used to link to this page
Your browser does not support the video tag.