My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - LIGHTING FIXTURES
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
04/04/2017
>
25I - AGMT - LIGHTING FIXTURES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2017 6:21:39 PM
Creation date
3/30/2017 5:35:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
25I
Date
4/4/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Award to Install LED Lights and <br />Light Controls Agreement for On -Bill Financing Loan <br />April 4, 2017 <br />Page 2 <br />At this juncture, staff requests the City Council to approve the implementation of the McFadden <br />Learning Center /PAAL Center project as the third of three library retrofit projects. The first retrofit <br />project was for the Main Library as approved by the City Council on October 4, 2016. The <br />second retrofit project was for Newhope Library as approved by the City Council on December 6, <br />2016. <br />The McFadden Learning Center /PAAL Center project consists of light fixtures (replace <br />fluorescent lights with energy- efficient light- emitting diode [LED] lights) and light controls (install <br />occupancy sensors and connect to lighting system and Building Management System). Project <br />benefits include an annual reduction of 41,682 kWh in electric usage, annual electric bill savings <br />of $10,379 and annual greenhouse gas reduction equivalent to taking 73 cars off the road as <br />shown below. <br />Total project cost is $49,068.36 including a $10,000 contingency. As tabulated above, project <br />cost will be fully funded by SCE using cash incentives of $7,246.66 and a zero interest On -Bill <br />Financing (OBF) loan of $41,821.70 for a total of $49,068.36. An innovative feature of the <br />recommended actions is the City will have no upfront costs as the awarded contractor will finance <br />the cost of the project. SCE will then pay contractor directly with the cash incentives and OBF <br />loan proceeds that SCE has approved for the project. <br />As a result of the OBF loan, McFadden Learning Center's /PAAL Center new electricity bill will be <br />different as it will have a lower amount due based on the energy reduction from the project, and a <br />new separate line -item to show the OBF loan repayment amount. This latter amount will reflect <br />kWh saved from the project multiplied by the relevant billing rate. Once the OBF loan is paid in <br />full SCE will discontinue the OBF loan repayment line -item. This will result in smaller electricity <br />bills at this location. (Cash incentives are grants and not repaid.) Staff requests the City Council <br />to approve the foregoing project and funding process. SCE Notices of Approval for incentives <br />and OBF loan amount (Exhibits 1 and 2) and the loan agreement form (Exhibit 3) are attached. <br />The Notice soliciting bids was advertised on December 27, 2016 on the City's online bid <br />management and publication system. A summary of the bids received is as follows: <br />45 Vendors were notified <br />1 Santa Ana vendor notified <br />23 Vendors downloaded the solicitation <br />10 Bids received <br />251 -2 <br />Estimated <br />Estimated <br />Estimated <br />Estimated <br />PROJECT <br />Estimated <br />Annual kWh <br />Annual Electric <br />Annual CARS <br />SCE Cash <br />COMPONENTS <br />OBF <br />SAVINGS <br />Bill SAVINGS <br />off the Road ' <br />:incentives <br />Light Fixtures <br />41,656 <br />$10,372 <br />73 <br />$7,246.66 <br />$40,760.70 <br />Light Controls <br />26 <br />$7 <br />0 <br />$0 <br />$ 1,061.00 <br />Total project cost is $49,068.36 including a $10,000 contingency. As tabulated above, project <br />cost will be fully funded by SCE using cash incentives of $7,246.66 and a zero interest On -Bill <br />Financing (OBF) loan of $41,821.70 for a total of $49,068.36. An innovative feature of the <br />recommended actions is the City will have no upfront costs as the awarded contractor will finance <br />the cost of the project. SCE will then pay contractor directly with the cash incentives and OBF <br />loan proceeds that SCE has approved for the project. <br />As a result of the OBF loan, McFadden Learning Center's /PAAL Center new electricity bill will be <br />different as it will have a lower amount due based on the energy reduction from the project, and a <br />new separate line -item to show the OBF loan repayment amount. This latter amount will reflect <br />kWh saved from the project multiplied by the relevant billing rate. Once the OBF loan is paid in <br />full SCE will discontinue the OBF loan repayment line -item. This will result in smaller electricity <br />bills at this location. (Cash incentives are grants and not repaid.) Staff requests the City Council <br />to approve the foregoing project and funding process. SCE Notices of Approval for incentives <br />and OBF loan amount (Exhibits 1 and 2) and the loan agreement form (Exhibit 3) are attached. <br />The Notice soliciting bids was advertised on December 27, 2016 on the City's online bid <br />management and publication system. A summary of the bids received is as follows: <br />45 Vendors were notified <br />1 Santa Ana vendor notified <br />23 Vendors downloaded the solicitation <br />10 Bids received <br />251 -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.