My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2017-04-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
04/04/2017
>
FULL PACKET_2017-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2017 4:44:32 PM
Creation date
3/31/2017 8:32:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/4/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
906
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />��������� ��� <br />���"�X����������/�� <br />David Vo|zDesign will provide construction documents for public <br />bidding ofSantiago Park Gas House Area development plans. <br />The basis ofthe design will bathe city supplied program and the <br />concept plan tobedeveloped inTask 1 below. <br />Task ^ Pre -Design <br />Initial project oervioeuvvi||inc|udmaxiteanalymis.xeViexwnfthe <br />preliminary plan and review ofbackground documents. 4kirk-off <br />meeting with the city project staff will be held to review initial find- <br />ings, discuss the project scope, goals and obi0ciives, potential <br />elements and issues and schedule. The DVD team will facilitate <br />and lead three (3)concept planning meetings with the Park San- <br />tiago Neighborhood Association (P8NA) to obtain input and to <br />finalize aconcept plan for this area. <br />Meetings ' Project Kick-off Meeting with city staff <br />Three (3)Concept Planning Meetings with P8NA <br />Presentation and review for approval bvthe <br />PRCSA <br />De|verab|en Synopsis ofinitial reviews and project oohedu|e <br />Upb)three (3) rendered concept plans for <br />Community review <br />Final Concept Plan for the area development <br />Task 2 - Design Development (60% plans) <br />The park design will bodeveloped based upon the approved con- <br />ceptual deoign.TheDVOtearn*/i{|undedokeiniUa|enQinoehng` <br />landscape architectural, and electrical engineering, <br />Meetings City Project Team Review Meeting <br />D*|Wmrubka* 50%construction documents, draft technical <br />specifications, opinion nfprobable cost, lighting <br />layouts, ph0t0ol8irioo,materials submittal, Also, <br />site survey and utilities information will ba <br />submitted for city review. <br />Task 3A - Construction Documents (90% plans) <br />Construction documents will be updated based upon city guid- <br />ance after review of Design Development documents. The up- <br />dated plans will provide detailed engineering, landscape, irriga- <br />tion and construction layout plans. Plans shall include: <br />��U� <br />����� -U�� <br />� <br />Lo�wm**OtyuS,,,,��m�� <br />nwfn 6.,,, hn-,d, <br />ff.�'d P " k <br />u,,/mm^ <br />P.+ Cily of StL <br />
The URL can be used to link to this page
Your browser does not support the video tag.