My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2017-04-04
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
04/04/2017
>
FULL PACKET_2017-04-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2017 4:44:32 PM
Creation date
3/31/2017 8:32:54 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
4/4/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
906
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OC Streetcar Construction Cooperative Agreement <br />April 4, 2017 <br />Page 2 <br />• The term of the cooperative agreement is from the beginning of construction until one year <br />past the beginning of revenue service. <br />• OCTA shall lead the construction of the Project. <br />• The Project shall be constructed consistent with the plans and specifications developed <br />during the design phase. <br />• The cooperative agreement outlines key construction coordination activities, including: <br />o Project Management <br />o Schedule <br />o Reporting <br />o Records Management <br />o Construction Coordination <br />o Business Access <br />o Street Closures/Traffic Control <br />o Water Service Shutdowns <br />o Public Notification <br />o Construction Access <br />o Construction Inspection <br />o Project Submittals <br />o Construction Acceptance <br />o Permits <br />o Safety <br />o Testing and Startup <br />o Coordination with Other City <br />Projects <br />o Public Involvement <br />• The City will provide construction inspection support services and project submittal <br />reviews on City -owned facilities, such as sidewalks, roadways, and traffic signals, as well <br />as project coordination with OCTA staff. <br />• The City's participation ensures City inspection of City infrastructure, input on Project <br />elements through meetings and design reviews, and overall collaboration. <br />• Consistent with OCTA's practice on major capital projects, OCTA agrees to compensate <br />the City for its participation on the Project. <br />• A detailed work plan has been developed and serves as the budget estimate for City <br />support reimbursement. <br />• The cost of the City's participation in the Project will be covered as a Project cost following <br />federal guidelines. <br />• The amount is a maximum obligation; the specific amount reimbursed to the City will be <br />based upon the level of City participation. <br />• The City shall only use indirect cost recovery rates that are compliant with federal <br />regulations and approved by a cognizant agency that is able to audit overhead rates to <br />meet federal guidelines. <br />The City is required to submit monthly invoices to OCTA for review, which shall include <br />signed timesheets and a summary of work performed during the month. <br />• The City is responsible for all betterment costs requested by the City. A betterment is an <br />element added to the Project by the City that is not needed for the Project. <br />25F-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.